Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.6 LAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹85.7 L+₹9,486.27 (0.11%)Rejected-Finance 268 237 MASTER KANHAIYA LAL ROAD AISHBAGH AISHBAGH LUCKNOW UTTAR PRADESH 226004 UDYAM UP 50 0018557 | LUCKNOW | UTTAR PRADESH | 226004 | L2 | Rejected-Finance Higher rate | |
| 3 | L3₹85.7 L+₹13,121.37 (0.15%)Rejected-Finance 30 INDUSTRIAL AREA KOKAR RANCHI 834004 JHARKHAND | RANCHI | JHARKHAND | 834004 | L3 | Rejected-Finance Higher rate | |
| 4 | L4₹89.0 L+₹3.4 L (3.93%)Rejected-Finance LG 4 LANDMARK ARCADE BADSHAH NAGAR LUCKNOW UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | L4 | Rejected-Finance Higher rate | |
| 5 | L5₹1.0 Cr+₹14.8 L (17.3%)Rejected-Finance 532 K 167 1 MEHNDI TOLA ALIGANJ LUCKNOW LUCKNOW UTTAR PRADESH 226024 | LUCKNOW | UTTAR PRADESH | 226024 | L5 | Rejected-Finance Higher rate |
| Sl No | Description | Qty | Unit | Pradeep Kumar Shukla L5 | DBS Engineers Pvt. Ltd. L4 | M/S RAVINDRA KOHLI CONTRACTOR L1 | M/S S.N and Company L2 | M/S Raj Construction L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Errection of scaffolding with the help of M.S. iron pipe, clamp, base plate, joint pin & nut bolt etc. and removing after execution of work, including supply of required materials/ labourers.(Rate Including GST) | 669.55 | sqmtr | 344 ₹2,30,325.2 | 319 ₹2,13,586.45 | 266.65 ₹1,78,535.51 Lowest | 267 ₹1,78,769.85 | 267.2 ₹1,78,903.76 |
| 2.00 | Dismantling and taking out fallen bulged and partly having wooden beam roof terrace, taking out and removal of dead, damaged buldged , out of plumb , lime concrete from the roof very carefully, including disposal of refuse as directed by the engineer in charge including all the supply of labours T & P etc, required proper completion of work at the site.(Rate Including GST) | 59.85 | Cum | 2,080 ₹1,24,488 | 1,829 ₹1,09,465.65 | 1,631.65 ₹97,654.25 Lowest | 1,632 ₹97,675.2 | 1,632.45 ₹97,702.13 |
| 3.00 | Providing / supply of sal wood beams in length upto 4 mtr and section 0.10 x 0.10 mtr without knought, cracks & finished all four sides.(Rate Including GST) | 7.11 | cum | 2,17,600 ₹15,47,136 | 1,95,408 ₹13,89,350.88 Lowest | 1,97,960 ₹14,07,495.6 | 1,97,970 ₹14,07,566.7 | 1,97,970.15 ₹14,07,567.77 |
| 4.00 | Providing / supply of sal wood planks 5cm thick without knought & cracks for laying over sal wood beams in roof work.(Rate Including GST) | 14.96 | cum | 1,49,600 ₹22,38,016 | 1,23,900 ₹18,53,544 Lowest | 1,36,100.5 ₹20,36,063.48 | 1,36,150 ₹20,36,804 | 1,36,150.15 ₹20,36,806.24 |
| 5.00 | Fixing of sal wood beams at appropriate measuring place, including applying wood preservative coat etc, completing with all respects.(Rate Including GST) | 231 | Nos | 3,264 ₹7,53,984 | 2,950 ₹6,81,450 | 2,590 ₹5,98,290 Lowest | 2,600 ₹6,00,600 | 2,600.15 ₹6,00,634.65 |
| 6.00 | Fixing of wooden planks over sal wood beam, including applying wood preservative coat etc , completing with all respects.(Rate Including GST) | 305.03 | sqmtr | 816 ₹2,48,904.48 | 750 ₹2,28,772.5 | 652 ₹1,98,879.56 Lowest | 660 ₹2,01,319.8 | 660.45 ₹2,01,457.06 |
| 7.00 | Providing and laying of double layer brick tiles laid in ratio of (1:1:1) 1 lime U/S, 1 coarse sand & 1 surkhi, on roof terrace completing with all respects.(Rate Including GST) | 299.23 | sqmtr | 4,000 ₹11,96,920 | 3,599 ₹10,76,928.77 | 3,311 ₹9,90,750.53 Lowest | 3,315 ₹9,91,947.45 | 3,315.45 ₹9,92,082.1 |
| 8.00 | Providing & laying of fresh lime concrete with the mortar of 1:1:1: 4 (1 lime:1 surkhi : 1 Coarse Sand : 4 Brick Ballast 20 to 25 mm size) mixed with bailgiri, gum & molasses etc , including supply of all materials, labours, T&P etc, required for proper completion of work.(Rate Including GST) | 44.88 | cum | 12,512 ₹5,61,538.56 | 11,328 ₹5,08,400.64 | 10,414.5 ₹4,67,402.76 Lowest | 10,415 ₹4,67,425.2 | 10,415.45 ₹4,67,445.4 |
| 9.00 | Lakhauri brick masonry work where fixing of sal wood beam bearing with lakhauri brick as per oniginal pattern in the mortar of 1:1:1 (1 Lime: 1 Surkhi : 1 Coarse sand) mixed bailgiri, gum & molasses etc, including supply of all materials, labours, T & P etc, required for proper completion of work.(Rate Including GST) | 36 | cum | 15,550 ₹5,59,800 | 14,160 ₹5,09,760 | 12,697.5 ₹4,57,110 Lowest | 12,700 ₹4,57,200 | 12,700.3 ₹4,57,210.8 |
| 10.00 | Dismantling and scrapping of dead decayed plaster very-very carefully including racking out of joints and washing of surface and prepare surface for re-plastering disposal of rubbish/ malba as directed by engineer-in-charge, including supply of labour and T&P etc.required for proper completion of work at site(Rate Including GST) | 1,535.62 | sqmtr | 175 ₹2,68,733.5 | 1,180 ₹18,12,031.6 | 141.5 ₹2,17,290.23 Lowest | 142 ₹2,18,058.04 | 143 ₹2,19,593.66 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
28 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist, ASI, Lucknow Circle
ASI, 9th floor of Kendriya Bhawan, Sector H, Aliganj, Lucknow
As per tender documents
2026_ASI_925221_1
5-3/832/2026-27-LKO-I-C
Open Tender
Miscellaneous Works
Works
240 days
Kazmain Building
As per tender documents
3 documents required · 3 mandatory
₹0
₹2.0 L
Yes
Lucknow
3 Oct 2026
8 Sept 2026
29 Sept 2026
8 Sept 2026
28 Sept 2026
8 Sept 2026
8 Sept 2026 - 10 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Errection of scaffolding with the help of M.S. iron pipe, clamp, base plate, joint pin & nut bolt etc. and removing after execution of work, including supply of required materials/ labourers.(Rate Including GST) | 669.55 | sqmtr | 100 | ₹66,955 |
| 2 | Dismantling and taking out fallen bulged and partly having wooden beam roof terrace, taking out and removal of dead, damaged buldged , out of plumb , lime concrete from the roof very carefully, including disposal of refuse as directed by the engineer in charge including all the supply of labours T & P etc, required proper completion of work at the site.(Rate Including GST) | 59.85 | Cum | 101 | ₹6,044.85 |
| 3 | Providing / supply of sal wood beams in length upto 4 mtr and section 0.10 x 0.10 mtr without knought, cracks & finished all four sides.(Rate Including GST) | 7.11 | cum | 102 | ₹725.22 |
| 4 | Providing / supply of sal wood planks 5cm thick without knought & cracks for laying over sal wood beams in roof work.(Rate Including GST) | 14.96 | cum | 103 | ₹1,540.88 |
| 5 | Fixing of sal wood beams at appropriate measuring place, including applying wood preservative coat etc, completing with all respects.(Rate Including GST) | 231 | Nos | 104 | ₹24,024 |
| 6 | Fixing of wooden planks over sal wood beam, including applying wood preservative coat etc , completing with all respects.(Rate Including GST) | 305.03 | sqmtr | 105 | ₹32,028.15 |
| 7 | Providing and laying of double layer brick tiles laid in ratio of (1:1:1) 1 lime U/S, 1 coarse sand & 1 surkhi, on roof terrace completing with all respects.(Rate Including GST) | 299.23 | sqmtr | 106 | ₹31,718.38 |
| 8 | Providing & laying of fresh lime concrete with the mortar of 1:1:1: 4 (1 lime:1 surkhi : 1 Coarse Sand : 4 Brick Ballast 20 to 25 mm size) mixed with bailgiri, gum & molasses etc , including supply of all materials, labours, T&P etc, required for proper completion of work.(Rate Including GST) | 44.88 | cum | 107 | ₹4,802.16 |
| 9 | Lakhauri brick masonry work where fixing of sal wood beam bearing with lakhauri brick as per oniginal pattern in the mortar of 1:1:1 (1 Lime: 1 Surkhi : 1 Coarse sand) mixed bailgiri, gum & molasses etc, including supply of all materials, labours, T & P etc, required for proper completion of work.(Rate Including GST) | 36 | cum | 108 | ₹3,888 |
| 10 | Dismantling and scrapping of dead decayed plaster very-very carefully including racking out of joints and washing of surface and prepare surface for re-plastering disposal of rubbish/ malba as directed by engineer-in-charge, including supply of labour and T&P etc.required for proper completion of work at site(Rate Including GST) | 1,535.62 | sqmtr | 109 | ₹1,67,382.58 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
DOC.pdf
Tender Documents • 5.31 MB
BOQ_972267.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .