Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹33.6 L+₹3.7 L (12.4%)Rejected-Finance PHAYANG GOMPA COMPLEX AGLING ROAD SKALZANGLING LEH LADAKH J K 194101 | LEH | LEH | LADAKH | 194101 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹38.1 L+₹8.2 L (27.3%)Rejected-Finance 403 GH MANSADEVI COMPLEX PANCHKULA 134109 HARYANA | PANCHKULA | HARYANA | 134109 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹40.5 L+₹10.6 L (35.3%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
14 Aug 2021, 6:00 pmClosed
COL S S BABU
Headquarters 138 Works Engineers Pin-914138 C/o 56 APO
REPAIR/MAINT OF CENTRAL HEATING PLANT AND HOT WATER PLANT INSTALLED AT RINCHEN AUDITORIUM AND UPPER TRANSIT CAMP UNDER AGE E/M OF GE 865 EWS AT LEH
2021_MES_460657_1
138WE/L-40/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE 865 EWS
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE 865 EWS
₹90,000
Yes
8 Sept 2021
17 Jul 2021
16 Aug 2021
17 Jul 2021
14 Aug 2021
31 Jul 2021
Amount
M&L for Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for laying UG cable/MS pipes in trenches on plan and n exc 1.5 m in depth in hard dense soil and getting out, complete all as specified and directed.
M&L for Returning, filling in (soil), including spreading, leveling, watering and well ramming in layers not exc. 25m, complete all as specified and directed.
M&L for Removing excavated material to a distance not exc. 50m and depositing where directed at a level not exc. 1.5m above the starting point, complete all as specified and directed.
MAINT OF BOILER
M&L for attending of complaint for day to day / daily complaints by employing skilled staff, checking the serviceability of fan coil unit of any capacity for having continuous sreviceability of FCU for any number of time as desired by Engr-in-Charge including replacement of minor spare part like Gasket, Teflon tape, flare nut, tightening of any loose glycol line connections, shifting FCU from one place to another place if required, heating up the freezed glycol line anywhere about the premices to have continuous flow of glycol fluid, repairing the insulation of pipe line of any size by providing shallow tape / GI wire as deemed fit, for fastening the insulation with pipe line, stopping any kind of leakage from any size of pipe line, tightening the loose electrical connections as related with FCU / Heating system, cleaning the air filter including radiator of FCU to the entire satisfaction of Engineer-in- Charge all as directed at site. Note :-(i) Attending any no of complaints of same unit different nature inside / outside will be considered as one job. (ii) Any kind of replacement of major items shall be measured and paid for separately under respective item of schedule 'A' (iii) Any nature of complaint related with FCUs, radiators, bursting/cracking/leakage of MS pipe lines, replacement of valves etc will be completed round the clock by suitable trademen (welder with suitable T & P,(including portable heating materials)-01,Skilled mechanic of CHS-01, Plumber/Fitter with helper-each o1, Supervisor-01 as per descretion of Engineer-in- Charge. (iv) Job slip will be maintained by the contractor Supervisor under supervision of concerned JE E/M CHS, suitable communication shall be maintained through JE incharge round the clock. (v) Any dely in attending complaint will be directly reported to higher authorities and suitable penalities will be incured from the contractor (@ 2000/- More then 2 days/48 hrs)
Dismantling of burner assembly of CHS and remvoing of side cover and repairing the same by removing the old burnt fire refractory cement plastering, replastering the same as per existing with fire refractory cement for boiler capacity 3-4 lakh kilo/cal/hr and complete servicing the boiler by removing the complete carbon/oil deposits with suitable coil shine chemical including repir to coil assembly by welding if there is any leakage found or any other repair required at site and reassembling/ testing the same, complete all as specified and directed.
All as per item No.6 but for 1-2 Lakh Kilo/cal/Hr.
S&F in sequence controller suitable for 3-4 lakh kilo/hr with burner rod assembly, complete all as specified and directed.
S&F in sequence controller suitable for 1-2 lakh kilo/hr with burner rod assembly, complete all as specified and directed.
S&F in replacement of ignition rod suitable for 3-4 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed.
S&F in replacement of ignition rod suitable for 1-2 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed.
S&F in replacement of ignition Transformer electronic type suitable for 3-4 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed.
S&F in replacement of ignition Transformer electronic type suitable for1-2 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed.
S&F temp controller digital type DTC 503 with sensor suitable for 3-4 lakh kilo/Cal/hr LAL 2.25 burner rod assembly, complete all as specified and directed.
S&F temp controller digital type DTC 503 with sensor suitable for 1-2 lakh kilo/Cal/hr LAL 2.25 burner rod assembly, complete all as specified and directed.
S&F in replacement of pressure gauage 0 to 20 Kg/cm sq as per existing, complete all as directed by Engineer-in-Charge.
S&F in replacement of photo cell as per existing suitable for 3-4 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed.
S&F in replacement of photo cell as per existing suitable for 1-2 lakh kilo/Cal/hr burner rod assembly, complete all as specified and directed.
S&F in replacement of burner nozzle suitable for 3-4 lakh K/Cal/Hr, complete all as specified and directed.
S&F in replacement of burner nozzle suitable for 1-2 lakh K/Cal/Hr, complete all as specified and directed.
S&F in replacement of Electrode suitable for burner of capacity 3-4 lakh K/Cal/Hr, complete all as specified and directed.
S&F in replacement of Electrode suitable for burner of capacity 1-2 lakh K/Cal/Hr, complete all as specified and directed.
S &F in replacement of Bridge rectifier suitable for 3-4 lakh K/Cal/hr, complete all as specified and directed.
S &F in replacement of Bridge rectifier suitable for 1-2 lakh K/Cal/hr, complete all as specified and directed.
S & F in replacement of hooter round type, complete all as specified and directed.
S&F in replacement of thermostate assembly tail type as per existing suitable for 0-30 degree centrigrade temprature, complete all as specified and directed.
S&F for closed cell elastometric insulation 30 to 40 Kg/Cub mtr density 25 mm thick (nitrite insulation) complete all as specified, Make- Eurobatex/ Superion/ Aeorflex.
S&F in replacement of oil pressure pump 7276-3D67A complete all as specified and directed.
S&F in replacement of Fuel filter 1/2 ltr, complete as specified and directed. Make- Kirloskar/Mico/TVS.
Removing of side cover of boiler burner assembly capacity, 3-4 Lakh KCL/hr servicing, D-carbonized all gasket as per bester packing and refixing after cleaning ( 4 months after again service), complete all as specified and directed by Engr-in-Charge.
Removing of side cover of boiler burner assembly capacity, 1-2 Lakh KCL/hr servicing, D-carbonized all gasket as per bester packing and refixing after cleaning ( 4 months after again service), complete all as specified and directed.
M&L for repair of exhaust pipe by welding, complete all as specified and directed.
S&F in replacement of auto air pressure valve 3/8" as per existing, complete all as specified and directed.
S&F in replacement of High pressure fuel pipe 1.5 mtr as per existing, complete all as specified and directed.
M&L for replacement of old diesel burner set of capacity 1 Lac kcal/hr comprising f diffuser, nozzle, electrodes, blast tube, solenoid valve, air damper adjustment, gear pmp, coupling set, oil supply pipe, gasket, ignition transformer, reset button, flame detector and controller comlete all as specified and directed by Engr-in-Charge. Make-Ecoflamem, Aquatherm, Rapid therm
M&L for replacement of old diesel burner set of capacity 4 Lac kcal/hr comprising f diffuser, nozzle, electrodes, blast tube, solenoid valve, air damper adjustment, gear pmp, coupling set, oil supply pipe, gasket, ignition transformer, reset button, flame detector and controller comlete all as specified and directed by Engr-in-Charge. Make-Ecoflamem, Aquatherm, Rapid therm
MAINT. Of Fan Coil Units
S&F in Repair / replacement of fan coil unit parts, duel shaft electric motor of capacity 30 watt 930 RPM, 3 speed as per existing, complete all as specified and directed.
S&F in replacement of FCU connection of copper pipe 20/16 mm with check nut at both side as per required length, complete all as specified and directed.
S&F in replacement of plug top 5 Amps as per existing, complete all as specified and directed.
S&F in replacement of needle valve 3/8" BSP as per existing, complete all as specified and directed.
S&F in temp controller regulator type , complete all as specified and directed. Make- Subzero.
S&F in replacement of inlet outlet Ball valve 3/4" for FCU as per existing, including supply and fixing MS / GI nipple of size 3/4 inch including welding work and cutting the existing rusty unserviceable MS/GI nipple complete all as specified and directed.
S&F Inlet/outlet ball copper valves set of 1/4", complete all as specified and directed by Engr-in-Charge.
S&F Pipe fitting of brass(Nipple outer thread) 1/4" size, complete all as specified and directed.
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of copper coils covered with aluminium finishing as per existing size of capacity 3000 K Cal / Hour including dismantling the existing unserviceable, complete all as specified and directed.
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of copper coils covered with aluminium finishing as per existing size of capacity 4500 K Cal / Hour including dismantling the existing unserviceable, complete all as specified and directed.
Supply and fixing radiator unit of FCU including connecting with the unit and making it leakproof of copper coils covered with aluminium finishing as per existing size of capacity 6000 K Cal / Hour including dismantling the existing unserviceable, complete all as specified and directed.
Dismantling the existing radiator unit of capacity from 3000 to 6000 K Cal per hour, taking it to nearest workshop cleaning the complete unit with coilshine chemical, detecting the leakage protion by applying nitrogen gas pressure, brazing the leakage protion, refixing the same unit at dismantled location including testing on load complete all as directed.
S & F in replacement of ring clip of flaxible PVC pipe of existing size all as specified and directed.
Maint. Of Pumps/ motors
Material and labour for rewinding of electric motor 3 phase 415 volts of capacity 7.5 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed.
Material and labour for rewinding of electric motor 3 phase 415 volts of capacity 5 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed.
Material and labour for rewinding of electric motor 3 phase 415 volts of capacity 2 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed.
Material and labour for rewinding of electric motor 3 phase 415 volts of capacity 0.5/1 HP with superior quality super enameled copper winding wire of appropriate size and gauge as existing including varnishing , cotton tape, PVC sleeves etc, complete all as specified and directed.
M&L for servicing to the glycol pump and motor of capacity 7.5HP, 2870 RPM including replacement of bearings, oil seals or any other spares / work required for smooth functioning of pump, complete all as specified and directed.
M&L for complete servicing of pumps suitable for 5 HP motors including replacement of bearings, seal, impellers etc as per site requirement, complete all as specified and directed.
M&L for complete servicing of pumps suitable for 2 HP motors including replacement of bearings, seal, impellers etc as per site requirement, complete all as specified and directed.
M&L for complete servicing of pumps suitable for 0.5/1 HP motors including replacement of bearings, seal, impellers etc as per site requirement, complete all as specified and directed.
Maint. Of Electric Panels
M & L for disconnecting the all connection in existing panel board complete and re-fixing the same after removing the burnt lugs/thimbles complete including replacing the U/S MCCBS, Contactors, relay, bus bar indicator lamps etc., all as specified and as direcrted. Note- MCCBS, Contactors, relay, indicator lamps, S/Switchs are to be measured and paid seperately.
S&F in replacement of DOL starter MK-1, 1 HP to 3 HP as per existing, complete all as specified and directed.
S&F in replacement of contactor type 3 TF 33, 415 volts complete all as specified and directed.
S&F in replacement of contactor type ML 1.5, 220 volts, complete all as speified and directed.
S&F in replacement of over load relay 8 to 12.5 Amps for contactor matching ser No 59 series 3 TF 33 complete all as specified and directed. Make- Siemens, L & T , Havells
S&F in replacement of over load relay 1.25 to 2 Amps for contactor matching ser no 60 series 3 TF 33, complete all as specified and directed. Make- Siemens, L & T , Havells
S&F in replacement of MCCB 63 Amps 25 KA, 3 Pole complete all as specified and directed.
S&F in replacement of MCCB 125 Amps 25 KA, 3 Pole complete all as specified and directed.
S&F in replacement of MCCB 200 Amps, 36 KA, 4 pole 415 V as per existing complete all as specified and directed.
S&F in replacement of MCCB 250 Amps, 25 KA, 3 pole 415 V as per existing complete all as specified and directed.
S&F in replacement of MCB TPN 63 Amps, 10 KA, 415 V as per existing complete all as specified and directed.
S&F in replacement of MCB TPN 6-32 Amps, 10 KA, 415 V as per existing complete all as specified and directed.
S&F in replacement of on load change over switch (side handle) in sheet enclosure, 100 Amp, 415 V, 50 Hz as per existing complete all as specified and directed.
S&F in replacement of off load change over switch (side handle) in sheet enclosure, 200 Amp, 415 V, 50 Hz as per existing complete all as specified and directed.
S&F in replacement of digital type volt meter 0-500 volts, complete all as specified and directed.
S&F in replacement of digital type Amp meter complete with suitable CTs 0-300 Amps, complete all as specified and directed.
S&F in replacement of indicating lamps RYB as per existing complete all as specified and directed.
S&F in replacement of rotary type ON/OFF switches, 22mm dia as per existing, complete all as specified and directed.
S&F in replacement of push button switch in RED or GREEN colours, 22mm dia as per existing, complete all as specified and directed.
S&F in replacement of PVC flexible copper multistrand wire 3 core of 6 sqmm as per existing, complete all as specified and directed.
S&F in replacement of PVC flexible copper multistrand wire 3 core of 4 sqmm as per existing, complete all as specified and directed.
S&F in replacement of PVC flexible copper multistrand wire 2 core of 4 sqmm as per existing, complete all as specified and directed.
Maint. Of Flow Pipes
Supply and fixing in replacement of Lagging all around with 150 mm thick sections bonded mineral wool of density 144 kg /cum conforming to IS 9842 for heating circulation pipe lines of 150mm over chicken wiremess complete and as directed. Note : Retrieved glass wool to be disposed off by the contractor.
Supply and fixing in replacement of Lagging all around with 100 mm thick sections bonded mineral wool of density 144 kg /cum conforming to IS 9842 for heating circulation pipe lines of 100mm over chicken wiremess complete and as directed. Note : Retrieved glass wool to be disposed off by the contractor.
Supply and fixing in replacement of Lagging all around with 80 mm thick sections bonded mineral wool of density 144 kg /cum conforming to IS 9842 for heating circulation pipe lines of 80mm over chicken wiremess complete and as directed. Note : Retrieved glass wool to be disposed off by the contractor.
Supply and fixing in replacement of Lagging all around with 65 mm thick sections bonded mineral wool of density 144 kg /cum conforming to IS 9842 for heating circulation pipe lines of 65mm over chicken wiremess complete and as directed. Note : Retrieved glass wool to be disposed off by the contractor.
Supply and fixing in replacement of Lagging all around with 50 mm thick sections bonded mineral wool of density 144 kg /cum conforming to IS 9842 for heating circulation pipe lines of 65mm over chicken wiremess complete and as directed. Note : Retrieved glass wool to be disposed off by the contractor.
M&L for repair to pipe line by welding the leakage portion of MS pipe line including using all T&P and men and materials required for repair/ welding the pipe line of size 50 mm to 200 mm including testing on full pressure. Note- Excavation shall be measured and paid separately under respective Item of Sch 'A'.
Supply and replacement of PP-R Pipe with fitting of 40 MM size, complete all as specified and directed.
Supply and replacement of PP-R Pipe with fitting of 32 MM size, complete all as specified and directed.
Supply and replacement of PP-R Pipe with fitting of 25 MM size, complete all as specified and directed.
Supply and replacement of PP-R Pipe with fitting of 20 MM size, complete all as specified and directed.
S&F in replacement of gun metal butter fly control valves of 100/125mm bore as per existing, complete all as specified and directed.
S&F in replacement of gun metal butter fly control valves of 80mm bore as per existing, complete all as specified and directed.
S&F in replacement of gun metal butter fly control valves of 65mm bore as per existing, complete all as specified and directed.
S&F in replacement of gun metal butter fly control valves of 40/50mm bore as per existing, complete all as specified and directed.
Supply, fixing and testing GI tubing 50 mm bore medium grade laid in ducts over the angle iron supports/fixed on the walls including fittings complete all as specified and directed.
Supply, fixing and testing GI tubing 40 mm bore medium grade laid in ducts over the angle iron supports/fixed on the walls including fittings complete all as specified and directed.
Supply, fixing and testing GI tubing 15 mm bore medium grade laid in ducts over the angle iron supports/fixed on the walls including fittings complete all as specified and directed.
Supply, fixing and testing GI tubing 20 mm bore medium grade laid in ducts over the angle iron supports/fixed on the walls including fittings complete all as specified and directed.
Supply and replacement of MS Pipes heavy grade with all fittings of 100 MM size, complete all as specified and directed by Engr-in-Charge.
Supply and replacement of MS Pipes heavy grade with all fittings of 80 MM size, complete all as specified and directed.
Supply and replacement of MS Pipes heavy grade with all fittings of 65 MM size, complete all as specified and directed.
Supply and replacement of MS Pipes heavy grade with all fittings of 50 MM size, complete all as specified and directed.
Supply and replacement of FCU connection flexible pipe 20/16 mm as per existing, complete all as specified and directed.
M&L for electronic control wiring of FCU of any size including electronic display, complete all as specified and directed.
Cleaning of MS diesel storage tanks of capacity 1000 ltrs by removing of sludge from tanks and scrapping the side walls by means of wire brush or emery paper and wash the same with castic soda and clear water and painting the internal wall with two coats of black rubber emulsion paint and painting the complete tank from out side with two coats of synthetic enamel paint, complete all as specified and directed.
M&L for cleaning of MS overhead circulation tank of capacity 1000 Ltr including all type of T&P and chemical required for the same, including welding work to repair leakage surface including opening and refixing the existing insulating materials to the external surface complete all as specified and directed.
betong construction company
EESSI
M/S MALIK CHAND SIRI RAM
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .