Tender Value
₹2.1 L
EMD Value
₹5,000
Closing Date
3 Aug 2026, 2:00 pm
EE/TPS
Tallah Pupming Station 71 B. T Road Kolkata -2
CONSTRUCTION OF WALKWAY FROM 24 INCH FEEDING VALVE OF 8 MG RESERVOIR TO GATE NUMBER 5A AT TALLAH PUMPING STATION.
2026_KMC_1033858_1
KMC/WS/TPS/14/2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
Tallah Pupming Station 71 B. T Road Kolkata -2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
23 Jul 2026
23 Jul 2026
5 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or sandstone)
including removing, spreading or stacking the spoils within a lead of
75 m. as directed. The item includes necessary trimming the sides of
trenches levelling, dressing and ramming the bottom, bailing out
water as required complete. (a) Depth of excavation not exceeding
1,500 mm. | 0.46 | CUBIC METER PERCENT | 11,927 | ₹5,486.42 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
4. (A) Filling in foundation or plinth by silver sand in layers not
exceeding 150 mm as directed and consolidating the same by
thorough saturation with water, ramming complete including the cost
of supply of sand. (payment to be made on measurement of finished
quantity) | 0.14 | CUBIC METER PERCENT | 93,621 | ₹12,919.7 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc.
A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks
including ramming and dressing bed to proper level and filling joints
with local sand | 92 | SQUARE METER | 358 | ₹32,936 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK
WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (a)
In foundation and plinth | 5.75 | CUBIC METER | 5,306 | ₹30,509.5 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR
AND REHABILITATION WORKS?(b) Applying 2 coats of Non-Toxic
Acrylic Polymer modified Paint having adhesive & waterproofing
properties by mixing in proportion (1 liquid: 4 cementitious material) or
as per manufacturer's specification for water proofing layer in water
tank etc. (No Departmental Cement is required) | 92 | SQUARE METER | 258 | ₹23,736 |
| 6 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,
ceiling etc.) with sand and cement mortar including rounding off or
chamfering corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging where
necessary (Ground floor).[Excluding cost of chipping over concrete
surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 115 | SQUARE METER | 186 | ₹21,390 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20
mm nominal size) excluding shuttering and reinforcement if any, in
ground floor as per relevant IS codes.(i) Pakur Variety | 9.2 | CUBIC METER | 4,482 | ₹41,234.4 |
| 8 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 13. Removal of rubbish,earth etc. from the working site and
disposal of the same beyond the compound, in conformity with the
Municipal / Corporation Rules for such disposal, loading into truck
and cleaning the site in all respect as per direction of Engineer in
charge | 7.84 | CUBIC METER | 166 | ₹1,301.44 |
| 9 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive
of 10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 10 | EACH | 326 | ₹3,260 |
| 10 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are
exclusive of 10% contractors profit and 1% Labour welfare cess
which would be admissible to the Contractors, but contractual
percentage will not be applicable. (II) The workersemployed on high
rise building or any structure over 30 ft in height and also workers
engaged in Tunnel shall be paid 20% extra wages. | 10 | EACH | 270 | ₹2,700 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
tbid14.pdf
Tender Documents • 0.49 MB
BOQ_2539221.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].