Tender Value
Refer Docs
Closing Date
4 Jan 2024, 2:00 pmClosed
Managing Director
No.12 Thambusamy street,Kilpauk,Chennai
Construction of culvert in front of Direct Purchase Centre Building in the village of Thonnadu in Maduranthagam Taluk in Chengalpattu District
2023_TCSC_402677_1
98/CE/DB/D6/99152-4/2023
Open Tender
Civil Works
Lump-sum
120 days
Thonnadu
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,400
Exempted
1 Mar 2024
22 Dec 2023
5 Jan 2024
22 Dec 2023
4 Jan 2024
22 Dec 2023
Amount
CIVIL WORK
EARTH WORK excavation for foundation in all classes of soils and subsoils to full depth, as may be directed except in hard rock, requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150mm layers well watered rammed and consolidated including depositing surplus earth with in the Godown or inside compound in places shown with initial leads and lifts, clearing, leveling site, shoring, strutting, baling of water wherever necessary etc., complete complying with standard specification and as directed.
CEMENT CONCRETE 1:5:10(one cement , five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed.
Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir,wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., Complete Column footing, Plinth beam, top tie beam
Rectangular beams and floor slabs, tie beams, lintels, landing slab, loft etc.,
Culvert wall
Reinforcement Cement Concrete 1:1 ½ :3 ( one cement, one and half sand, three aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed. In foundation and basement
Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed.
White washing two coats with best shell lime in all floors including cost of shell lime, gum, kanjee and brushes etc., complete complying with standard specification and as directed.
G Velu
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_479249.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .