Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.6 Cr+₹3.3 L (2.03%)Admitted-Finance SRI MUKTSAR SAHIB CANAL GROUND WATER DIVISION GIDDERBAHA PUNJAB PB | SRI MUKTSAR SAHIB | PUNJAB | 151202 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rajesh Kumar Middha Govt. Contractor L1 | SUBHASH CHANDER SUKHIJA CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 885.44 | cum | 71,720.64 ₹71,720.64 Lowest | 71,720.64 ₹71,720.64 Lowest |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1,306.02 | cum | 1,48,886.28 ₹1,48,886.28 Lowest | 1,48,886.28 ₹1,48,886.28 Lowest |
| 3.00 | Dressing of New Earthwork | 9,684.03 | sqm | 12,105.04 ₹12,105.04 Lowest | 12,589.24 ₹12,589.24 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | cum | 147 ₹147 Lowest | 150 ₹150 |
| 5.00 | Re-handling of earthwork recently executed | 885.44 | cum | 57,553.6 ₹57,553.6 Lowest | 57,553.6 ₹57,553.6 Lowest |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 16.52 | km | 14,008.96 ₹14,008.96 Lowest | 14,008.96 ₹14,008.96 Lowest |
| 7.00 | Dressing of Bed and preparation of sub grade for lining. | 8,365.13 | sqm | 94,944.23 ₹94,944.23 Lowest | 1,00,381.56 ₹1,00,381.56 |
| 8.00 | Earth work in excavation in foundations, trenches etc. in allkinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed within lead of 30 meters. | 7.86 | cum | 1,501.26 ₹1,501.26 Lowest | 1,524.84 ₹1,524.84 |
| 9.00 | Dismentalling Of Brick Work | 1,147.64 | cum | 8,24,005.52 ₹8,24,005.52 Lowest | 8,60,730 ₹8,60,730 |
| 10.00 | Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls | 1,285.76 | cum | 93,21,760 ₹93,21,760 Lowest | 96,43,200 ₹96,43,200 |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
25 Sept 2026, 12:00 pmClosed
Executive Engineer, Abohar Canal Ground Water D
Executive Engineer, Abohar Canal Ground Water D
Estimate for Reconstruction/Remodeling of Water Course of O/L RD 5736/TL of Koharianwali Minor Village- Koharianwali District Fazilka
2026_WR_170812_10
E-Tendering Notice No.13/Abohar Canal Ground Water Division /2026-27Dated 24/06/2026
Open Tender
Civil Works - Canal
Item Rate
FAZILKA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹2.9 L
Yes
28 Sept 2026
21 Aug 2026
25 Sept 2026
21 Aug 2026
25 Sept 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 885.44 | cum | - | - |
| 2 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1,306.02 | cum | - | - |
| 3 | Dressing of New Earthwork | 9,684.03 | sqm | - | - |
| 4 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | cum | - | - |
| 5 | Re-handling of earthwork recently executed | 885.44 | cum | - | - |
| 6 | Dag belling single kassi stroke minimum 7.5 cm depth. | 16.52 | km | - | - |
| 7 | Dressing of Bed and preparation of sub grade for lining. | 8,365.13 | sqm | - | - |
| 8 | Earth work in excavation in foundations, trenches etc. in allkinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed within lead of 30 meters. | 7.86 | cum | - | - |
| 9 | Dismentalling Of Brick Work | 1,147.64 | cum | - | - |
| 10 | Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls | 1,285.76 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_354206.xls
BOQ • 0.29 MB
SBD5736.pdf
Additional Documents • 0.15 MB
Corrigendum28.pdf
PDF • 0.10 MB
Corrigendum27.pdf
PDF • 0.10 MB
Corrigendum26.pdf
PDF • 0.26 MB
Corrigendum25.pdf
PDF • 0.10 MB
Corrigendum24.pdf
PDF • 0.10 MB
Corrigendum23.pdf
PDF • 0.26 MB
Corrigendum21.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .