| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance | L1 | Accepted-Finance 1st Lowest | |
| 2 | L2₹2.6 L+₹12,600 (5.09%)Accepted-Finance | L2 | Accepted-Finance 2nd Lowest | |
| 3 | L3₹2.8 L+₹30,100 (12.2%)Accepted-Finance | L3 | Accepted-Finance 3rd Lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Required work completion certificate not uploaded as per NIT Condition i.e three works of 40 percentage or two works of 60 percentage or one work of 80 percentage. Hence rejected |
Tender Value
₹2.9 L
EMD Value
₹5,786
Closing Date
7 Sept 2022, 10:00 amClosed
EE WSD APWD
EE WSD APWD Port Blair
Re installation of existing Air conditioners installed in front portion of the DCSA office building after face lifting civil works including replacement of old AC unit in the chamber of Tehsildar Panchayat and Municipal Elections
2022_APWD_7105_1
117/NIT/WSD/2022-23
Open Tender
Air-Conditioner
Works
30 days
Port Blair
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹5,786
11 Oct 2022
27 Aug 2022
7 Sept 2022
27 Aug 2022
7 Sept 2022
29 Aug 2022
27 Aug 2022 - 7 Sept 2022
Amount
Re-installation, testing and commissioning of following capacity split type Air Conditioner complete i/c servicing the unit, cutting/ drilling holes on the wall for passing gas pipes , fixing PVC pipe on the wall through the holes and cementing, painting to give an even look and smooth finish, wrapping PVC non adhesive tape over insulation of gas pipe etc including gas charging with R-22/R-410a/ R-32 gas as required and as per the direction of E-in-C.
1.5/02 Ton split/window type
Providing and fixing of refrigerant copper pipes of following sizes (Suction & delivery) of split type AC i/c providing 2.5 sqmm 4 core electrical cable, insulation, extra gas charging and covering with PVC non adhessive tape over the insulation of refrigerant pipes and as per the direction of E-in-C
Refrigerant pipes of Sizes 5/8" & 3/8"
Supplying and fixing of following sizes of CPVC plumbing pipe along with accessories for fixing as drain pipe to IDU of split type Air conditioner in surface/recess make: PRINCE SMARTFIT or equivalent including connections using cpvc cement solvent,providing suitable size union in evry 03 metres, elbows, Tee, F.T.A etc ,cutting the wall and making good the same in case as required Make: PRINCE SMARTFIT or equivalent.
Supplying and fixing UPVC trunking profile duct of following size directly on wall for covering refrigerent pipes equivalent to Make-Precision code no PT 10050 as per the instruction of E-in-C
100 mm x 50 mm
SITC of 02 Ton 5 star(As per 2018 BEE star rating) or 4 star(As per 2022 BEE star rating) Inverter High wall split type Air Conditioner (1 phase 220 Volt) with maximum cooling capacity of atleast 7000 Watts HITACHI KIYORA 5100X Model RMRG524HEEA or of equivalent cooling capacity in BLUESTAR/ VESTAR/ IFB/ MITSUBISHI/ O GENERAL/ DAIKIN with copper Condenser coil and rotary compressor i/c providing standard length of refrigerant copper pipe kit, cutting, drilling holes on the wall , cementing, painting to give an even look and smooth finish, wrapping PVC non adhessive white tape over insulation of gas pipe etc as required and as per the direction of E-in-C.
Supplying and fixing of 5KVA Voltage Stabilizer Suitable for 2 ton Air Conditioner as required of Make V Guard Model VND 500 (Voltage Range 150V-285V,15Amps.) or equivalent.
Fabrication of stand/Pedestal for keeping the indoor/out door unit of split type AC of various capacity made of suitable size of M S Angle and painting with one coat of red oxide and paint as required.
ROYAL ENGINEERING WORKS
Hi Tech Engineering and consultancy services
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .