Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹35.6 L+₹2.9 L (8.78%)Accepted-AOC NO 3 JANI JAN KHAN ROAD 1ST LANE ROYAPETTAH CHENNAI 600 014 | CHENNAI | CHENNAI | TAMIL NADU | 600014 | L3 | Accepted-AOC Being the lowest bonafide tender | |
| 2 | L1₹32.7 LRejected-Finance | L1 | Rejected-Finance Not found in order | |
| 3 | L2₹35.5 L+₹2.8 L (8.70%)Rejected-Finance 1001 63 SHALIMAR GARDEN ISMAILGANJ NEAR INDIRA NAGAR SECTOR 08 CROSSING LUCKNOW 226016 | LUCKNOW | UTTAR PRADESH | 226016 | L2 | Rejected-Finance Not found in order | |
| 4 | L3₹35.6 L+₹2.9 L (8.78%)Rejected-Finance 27 1ST STREET PERIYAR NAGAR 1ST STREET PERIYAR NAGAR ADAMBAKKAM KANCHIPURAM TAMIL NADU 600088 | CHENNAI | TAMIL NADU | 600088 | L3 | Rejected-Finance Not found in order | |
| 5 | Rejected-Technical D 3 7TH BLOCK JAIN GREEN ACRES DHARGA ROAD ZAMIN PALLAVARAM CHENNAI 600 043 | CHENNAI | CHENNAI | TAMIL NADU | 600043 | - | Rejected-Technical Contractor is not fulfilling the laid down criteria |
Tender Value
Refer Docs
EMD Value
₹88,900
Closing Date
5 Jun 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Chennai
Fort Saint George Chennai
MANNING AND OPERATION OF CERTAIN ELECTRIC SUPPLY INSTALLATIONS UNDER GE CHENNAI
2021_MES_435665_2
8493/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
Fort Saint George Chennai
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE Chennai
₹88,900
7 Jul 2021
22 May 2021
7 Jun 2021
22 May 2021
5 Jun 2021
24 May 2021
60 days
Amount
Manning and operation of HT/ LT switch gear and DG Set installed at ATNK & K Area substation completely in three shifts of 08 hours each including Sundays and holidays by employing 01 electrician in each shift (total 03 electricians per day) for entire system comprising of switching ON/ OFF the HT/ LT breakers, to attend the telephone complaint including routine maintenance such as checks, finding faults and maintaining all records and documents, complete all as specified and directed for the following:- 400 KVA Transformer - 01 No 250 KVA Transformer - 01 No 160 KVA Transformer - 01 No 100 KVA Transformer - 01 No 62.5 KVA DG set - 01 No. 40 KVA DG set - 01 No. VCB - 02 Nos RMG - 01 No LBS - 03 Nos LT Panel with ACB - 03 Nos Shift timings shall be as under:- 1st shift : 0600 hrs to 14.00 hrs 2nd Shift : 1400 hrs to 2200 hrs 3rd Shift : 2200 hrs to 0600 hrs Total- 03 Electricians.................(i)
Manning and operation of HT/ LT switch gear and DG set installed at NFG substation completely in three shifts of 08 hours each including Sundays and holidays by employing 01 electrician in each shift (total 03 electricians per day) for entire system comprising of switching ON/ OFF the HT/ LT breakers, to attend the telephone complaint including routine maintenance such as checks, finding faults and maintaining all records and documents complete all as specified and directed for following:- 315 KVA Transformer - 01 No 40 KVA DG Set - 01 No VCB - 01 No RMG - 01 No LT Panel with ACB - 01 No Shift timings shall be as under:- 1st shift : 0600 hrs to 14.00 hrs 2nd Shift : 1400 hrs to 2200 hrs 3rd Shift : 2200 hrs to 0600 hrs Total- 03 Electricians.............(ii)
Manning and operation of HT/ LT switch gear and DG Set installed at Fort substation completely in three shifts of 08 hours each including Sundays and holidays by employing 01 electrician in each shift (total 03 electricians per day) for entire system comprising of switching ON/ OFF the HT/ LT breakers, to attend the telephone complaint including routine maintenance such as checks, finding faults and maintaining all records and documents complete all as specified and directed for following:- 400 KVA Transformer - 02 No DG Set - 02 Nos VCB - 02 Nos RMG - 01 No LT Panel - 08 Nos Shift timings shall be as under:- 1st shift : 0600 hrs to 14.00 hrs 2nd Shift : 1400 hrs to 2200 hrs 3rd Shift : 2200 hrs to 0600 hrs Total- 03 Electricians............(iii)
Manning and operation of HT/ LT switch gear and DG Set installed at SFA Nandanam substation completely in two shifts of 08 hours each including Sundays and holidays by employing 01 electrician in each shift (total 02 electricians per day) for entire system comprising of switching ON/ OFF the HT/ LT breakers, to attend the telephone complaint including routine maintenance such as checks, finding faults and maintaining all records and documents, complete all as specified and directed for the following:- 100 KVA Transformer - 02 Nos 63 KVA DG Set - 01 No VCB - 03 Nos LT Panel - 02 Nos Shift timings shall be as under:- 1st shift: 0600 hrs to 1400 hrs 2nd Shift: 1400 hrs to 2200 hrs Total- 02 Electricians............(iv) Total Electricians per day against above four locations=11 No.
Electrician (Skilled) per person as per existing rates.
Employees Provident Fund as per existing rates
Employees State Insurance as per existing rates
Over Head & Profit on total of Srl No. 5.00 to 7.00
Labour Welfare Cess (LWC) on total of Srl No. 5.00 to 8.00
GST as per existing rates on total of Srl No. 5.00 to 9.00
Notes applicable to BOQ Srl item No 1 to 4:- (a) The person employed shall be responsible for attending break downs and complaint of substation, replacement of HT/ LT fuses and to liaise with TNEB to restore electric supply in case of failure from TNEB. (b) The person employed shall also be responsible repairs to LT cables including binding and jointing to restore electric supply, repair/ replacement of service wire and any other minor work for restoring the electrical supply as directed. (c) General cleanliness and upkeeping existing plants and vegetation within the premises of the plant by deploying additional manpower with T&P if required at any time and all as directed by Engineer-in-Charge. (d) Contractor shall made payment through authorised bank and photocopy of receipt of payment shall be attached with RAR/FB. (e) Duty roster will be submitted by the contractor before commencement of the month for obtaining the approval of JE and Engineer-in-charge. Any change the duty roster will be made by the contractor, only after approval of Engineer-in-charge. (f) Contractor shall monitor the duties of all Electricians ands submit report to concerned Engr-in-Charge/ JE E/M regarding availability of manpower and also monitor for watch and guard of installation. Any loss of damage to the plant equipment installed and Govt. property in the E/M installation premises shall be made good by the contractor. Rates quoted by the contractor are deemed to include for this clause. (g) Contractor should arrange proper uniform with name plate displayed in shirt for the mechanics and its cost shall be deemed to be inclusive in the quoted rate. (h) Contractor shall be responsible to monitor the duties of electricians during change of shift and submit the report to Engineer-in-Cjharge/ JE E/M and quoted rtes shall be deemed to include for the same.
Notes applicable to BOQ Srl item No 1 to 4 (Contd...):- (j) The rates quoted shall be deemed to be inclusive of the documents such as Log books of the plants, Plant Running Record Book and Plant Maintenance record Book. The rates quoted shall be inclusive of tools required for running and maintenance of plants. (k) Contractor to check Particular Specifications also for further details. (l) For the purpose of pament of minimum fair wages, Electrician shall be considered as 'SKILLED WORKER'. (m) The rate quoted shall not be less than minimum wages as notified by Govt of India/ State Govt/ Local body whichever is higher including all statutory provisions such as EPF, ESIC, bonus, Taxes etc and rate of GST as applicable on the last due date of bid submission. (n) In such case, the lowest tender shall be determined by the lowest amount amongst valid/ bonafide bids only. (o) Bid with 'NIL' or 'Zero' quoting against OH & Profit shall render the bid as 'Non-bonafide'. (p) Contractor is required to quote upto two digit after decimal place or otherwise it will be considered by rounding off to two digits after decimal place. (q) In case of tie amongst bidders, following criteria shall be applied to decide the lowest bidder for acceptance:- (aa) When tie is amongst MES enlisted firms, order of acceptance shall be as given below:- (i) Bidder of highest class will be considered for acceptance. (bb) In MES in case of tie between two or more same class bidder. (i) Highest class bidders having average marks in the performance reports stage II of last 5 completed works. (Contractor to be submitted Affidavit, Work Order, Completion Certificate as & when required). (ii) Bidder having highest amount of working capital. (cc) When tie involves unlisted firm also:- (i) Bidder having highest amount of working capital.
RK ENTERPRISES
SRI LAKSHMI ASSOCIATES
EVEREST ENGINEERING WORKS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .