Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹69.4 LAccepted-AOC | 1 | Accepted-AOC L-1 Bidder | |
| 2 | 2₹77.1 L+₹2.8 L (3.74%)Rejected-AOC | 2 | Rejected-AOC Higher Rates | |
| 3 | 3₹83.3 L+₹9.0 L (12.1%)Rejected-AOC | 3 | Rejected-AOC Higher Rates |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
12 Feb 2020, 11:00 amClosed
Deputy Chief Engineer TLSC Circle
Flat no 12 and 16 Shakti vihar PSTCL patiala
Laying of tower foundations,Erection of Towers,Stringing and Sagging of 220 KV line from 220 KV S/Stn Verpal to 220 KV Dukhniwaran (Contributory work)
2019_POWER_42394_1
08/TLSC/PTA/2019-20
Open Tender
Electrical Works
Percentage
300 days
Patiala
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.6 L
Yes
3 Aug 2020
26 Dec 2019
13 Feb 2020
26 Dec 2019
12 Feb 2020
26 Dec 2019
eProcurement System Government of Punjab Created By: Basant kumar jindal Created Date/Time: 27-May-2020 01:51 PM Tender Title: Laying of tower foundations,Erection of Towers,Stringing and Sagging of 220 KV line from 220 KV S/Stn Verpal to 220 KV Dukhniwaran (Contributory work) Tender ID: 2019_POWER_42394_1
Tender Inviting Authority: Deputy Chief Engineer, TLSC Circle, PSTCL, Patiala
Name of Work: Laying of tower foundations,Erection of Towers,Stringing & Sagging of 220 KV line from 220 KV S/Stn Verpal to 220 KV Dukhniwaran (Contributory work)
Contract No: T.E.No.08/TLSC/PTA/2019-20
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 MVL ENTERPRISES 6941563.00 11.00 7705134.93 Seventy Seven Lakh Five Thousand One Hundred and Thirty Four
2.00 R S Engineers 6941563.00 7.00 7427472.41 Seventy Four Lakh Twenty Seven Thousand Four Hundred and Seventy Two
3.00 Bhandari Engg Co Pvt Ltd 6941563.00 20.00 8329875.60 Eighty Three Lakh Twenty Nine Thousand Eight Hundred and Seventy Five
Lowest Amount Quoted BY: R S Engineers(7427472.41)
BOQ Summary Details Tender Title: Laying of tower foundations,Erection of Towers,Stringing and Sagging of 220 KV line from 220 KV S/Stn Verpal to 220 KV Dukhniwaran (Contributory work) Tender ID: 2019_POWER_42394_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 R S Engineers 7427472.41 L1
2 MVL ENTERPRISES 7705134.93 L2
3 Bhandari Engg Co Pvt Ltd 8329875.60 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .