Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
25 Aug 2020, 12:00 pmClosed
SUPREINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, MEERUT
DEPOSIT WORK RUNNING CONTRACT DIFFERENT SITES AT VARIOUS 33 KV SUB STATIONS IN THE AREA OF EDSD II PALLAVPURAM UNDER EDD III PALLAVPURAM, MEERUT
2020_PVVNL_494835_1
30/EDC/MT/2020-21
Open Tender
Electrical Works
Lump-sum
30 days
WORKS
DEPOSIT WORK RUNNING CONTRACT DIFFERENT SITES AT VARIOUS 33 KV SUB STATIONS IN THE AREA OF EDSD II PALLAVPURAM UNDER EDD III PALLAVPURAM, MEERUT
3 documents required · 3 mandatory
₹590
SUPREINTENDING ENGINEER
₹2,000
Yes
25 Aug 2020
17 Aug 2020
25 Aug 2020
17 Aug 2020
25 Aug 2020
17 Aug 2020
Amount
Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :-
PCC Pole 8.5 Mtr Long/ST Pole 11 Mtr. Long.
Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc.
10 KV to 100 KV T/F including complete related material required for transformer.
XLPE 11 KV Cable 3x70 to 185 mm
CT PT Unit Complete
Meter Cubical
Cartage of following material from JE, Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :-
PCC Pole 8.5 Mtr Long/ST Pole 11 Mtr. Long.
Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc.
10 KV to 100 KV T/F including complete related material required for transformer.
XLPE 11 KV Cable 3x70 to 185 mm.
CT PT Unit Complete
Meter Cubical
Erection of PCC pole 8.5 Mtr long/STP Pole 11 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of all 11 KV HT/LT line accessories.
Erection of Double pole on PCC pole 8.5 mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of MS angle and MS channel, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators.
Mounting of 10 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT side of T/F.
Mounting of CT PT unit including connection of incomeing and outgoing side
Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories.
Erection of stay rod complete after digging a pit of size 1.20 x0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming.
Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Laying lifting & sagging of LT line with ACSR weasel Conductor including proper binding & jumpring.
3 phase 4 wire line
Dismantel of CT/PT unit
Dismantel of Meeter Cubical
Dismantel of double Pole
Back Cartage of site to JE Store
Dismentel of double pole accessories
Damage meter cubical
Damage CT PT Unit
Back Cartage of JE Store to centerl Store meerut
Damage meter cubical
Damage CT PT Unit
Earthingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GL wire.
Guarding of line with G.I. wire having 2 no. horizontal wire & 3 Mtr distance odf laces of ten SWG G.I. wire after fabrication of guard cross arms of & fixing the same in supports.
Dissmentling of Damaged & Broken PCC/ST pole/R.S. Joist by digging the pits & removel of complete HT/LT line accessories.
Cutting & chopping tree branches near side of line for making the clearance between line and tree.
providing and fixing stay clamps.
Providing and fixing Holding clamps.
Providing and fixing LT clamps.
Providing and fixing LT Insulator clamps.
Providing and fixing Bolt and Nuts.
Providing and fixing of G.I. Pipe
Laying of 11 KV XLPE cable in cable tranch after digging of tranch. Then filling the cable tranch with excavated earth soil bricks over the cable.
Fixing the cable jointing kit with the end of XLPE cable including mounting the same on pole with proper binding.
Fixing of Distributon box on suport after providing and fixing of fixing clamp including connection of LT ABC Cable
Fixing of meter cubical including grouting the bolt and Nut and connection of cable
Laying lifting and sagging including mounting of LT ABC cable of size 1x25 to 3x95 including fixing of all required its accessorise
Water level earthing with GI Pipe 32 mm Dia and MS Flat of size 45x5mm
NIRWAN ASSOCIATES
M/s Priya Engineering And Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .