Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-Finance 71 2 KHATIPURA NEAR ELECTRONIC COMPLEX INDORE 452010 | INDORE | MADHYA PRADESH | 452010 | ₹30.0 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹34.1 L+₹4.1 L (13.8%)Rejected-Finance G 2 AASTHA APARTMENT 763 RANI SATI NAGAR LANE NO 6 JANPATH AJMER ROAD JAIPUR 302019 | JAIPUR | RAJASTHAN | 302019 | ₹34.1 L+₹4.1 L (13.8%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹39.7 L+₹9.7 L (32.3%)Rejected-Finance 129 1A PARVEEN COLONY TRIKUTA NAGAR JAMMU 180012 | JAMMU | JAMMU AND KASHMIR | 180012 | ₹39.7 L+₹9.7 L (32.3%) | L3 | Rejected-Finance L3 bidder |
| 4 | Rejected-Technical KRALPORA TEHSIL B K PORA BUDGAM P O KRALPORA BAGH MEHTAB SRINAGAR J K 190019 | BUDGAM | JAMMU AND KASHMIR | 190019 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | VINAYAK TECHNICO L2 | sundaram infra and corporation L1 | Vipan Kumar Verma L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supplying of packed Elastomeric concrete compund (Flex-O-Patch of choksey chemicals/Delpatch of D.S Brown or equivalent approved make) at site. The one pack of 10 kg Elastomeric concrete shall consist of 3 kg hardner 1.5 kg base & 5.5 kg of sand & fibre powder. | 2,120 | kg | 510 ₹10,81,200 Lowest | 545 ₹11,55,400 | 610 ₹12,93,200 |
| 2.00 | Supplying of primer of Choksey make for Flexopatch or equivalent of approved make ) for Elastomeric concrete compund at site. | 53 | ltr. | 399 ₹21,147 Lowest | 500 ₹26,500 | 400 ₹21,200 |
| 3.00 | Supplying of primer (RDL-942 of Choksey Chemicals / 105 of D.S Brown or equivalent approved make ) for Polysulphide sealant for joints at site. | 105 | ltr. | 399 ₹41,895 Lowest | 500 ₹52,500 | 400 ₹42,000 |
| 4.00 | Repairing of damaged portion of rigid pavement with Elastomeric concrete compound (Flex-O-Patch of Choksey chemicals/ Delpatch of D.S Brown or equivalent) after marking, cutting, chipping the pavement up to required size by using mechanical chippers, side locking on the vertical face, cleaning the prepared area by sand blasting with medium grit sand, masking and pouring the compound, finishing & texturing complete as per manufacturer specifications and the direction of EIC with required machines & tools.
Note: The rate quoted shall be exclusive of cost of flexo Item no. 1 Primer RDL-942 | 2,000 | kg | 205 ₹4,10,000 | 60 ₹1,20,000 Lowest | 310 ₹6,20,000 |
| 5.00 | Cleaning of existing expansion joints and providing & filing with polysulphide joint sealing compound (confirming to grade BS:5212, Part-I, 1990) of Dr. Fixit or equivalent including painting the side of slab with approved primer and filling the groove 25 mm or more in width as per actual joint width status at site x 45mm deep ( inc. of backer rod depth) including inserting the backer rod of Supreme or equivalent of appropriate dia (minimum 30mm or more as per actual joint width status at site) of approved make to receive the specified sealing compound, providing and applying bond breaking tape on top edges of joint to prevent accidental spillage of sealant on top surface and to give a neat finish to the sealant has been applied and tooled, all complete as per specification and direction of EIC.
Note: The rate quoted shall be exclusive of cost of Item no. 3 | 2,000 | mtr | 380 ₹7,60,000 | 300 ₹6,00,000 Lowest | 375 ₹7,50,000 |
| 6.00 | Cleaning of existing dummy/construction joints and providing & filling with polysulphide joint sealing compound (confirming to grade BS: 5212, Part-I, 1990) of approved make Dr. Fixit or equivalent including painting the sides of slab with approved primer and filling the groove 10mm or more in width as per actual joint width status at site x 25mm deep ( inc. of backer rod depth) including inserting the backer rod of Supreme or equivalent of appropriate dia minimum 12mm or more, of approved make to receive the specified sealing compound, providing and applying bond braking tape on top edges of joint to prevent accidental spillage of sealant on top surface and to give a neat finish to the sealant has been applied and tooled, all complete as per specification and direction of EIC.
Note: The rate quoted shall be exclusive of cost of Item no. 3 | 3,000 | mtr | 132 ₹3,96,000 | 100 ₹3,00,000 Lowest | 140 ₹4,20,000 |
| 7.00 | Supply of SW-CRETE T-02 or equivalent high performance thin layer rapid repair compound. Material should be self-flowing having compressive strength after 2 hrs. 20MPA after 1 day - 30 MPA after 28 days 50 MPA. Pull strength after 28 days - 1.0 MPA. (Minimum) Expansion rate 0.10%. (maximum). Curing time should be 2 hrs. to accept traffic as per specifications and directions of Engineer-in-Charge. | 3,300 | kg | 160 ₹5,28,000 Lowest | 180 ₹5,94,000 | 185 ₹6,10,500 |
| 8.00 | Laying of SW-CRETE T-02 or equivalent high performance thin layer rapid repair compound. Material should be self-flowing having compressive strength after 2 hrs. 20MPA after 1 day - 30 MPA after 28 days 50 MPA. Pull strength after 28 days - 1.0 MPA. (Minimum) Expansion rate 0.10%. (maximum) . Rate inclusive of milling the old surface area for required depth & matching with the existing profile, cleaning with compressed air, high pressure water jet cleaning, mixing of SW-CRETE T-02 in machine, pouring, finishing, texturing, curing time should be 2 hrs. to accept traffic as per specifications and directions of Engineer-in-Charge.
a) Rate Excluding material cost of Item no. 7 | 3,000 | kg | 58 ₹1,74,000 | 50 ₹1,50,000 Lowest | 70 ₹2,10,000 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
16 Feb 2026, 6:00 pmClosed
AGM (E-C)
O/o AIRPORT DIRECTOR AIRPORTS AUTHORITY OF INDIA CIVIL AIRPORT JAMMU
Repairing of distressed portion, pot-holes and expansion/contraction joints of apron and runway 18 end at Civil Airport Jammu
2025_AAI_259139_2
AAI/JAMMU/ENGG. CIVIL/Apron Repair/2025/09
Open Tender
Civil Works
Item Rate
90 days
CIVIL AIRPORT JAMMU
AS PER NIT
12 documents required · 12 mandatory
₹1,180
₹1.2 L
18 Apr 2026
30 Jan 2026
18 Feb 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
30 Jan 2026 - 5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying of packed Elastomeric concrete compund (Flex-O-Patch of choksey chemicals/Delpatch of D.S Brown or equivalent approved make) at site. The one pack of 10 kg Elastomeric concrete shall consist of 3 kg hardner 1.5 kg base & 5.5 kg of sand & fibre powder. | 2,120 | kg | 100 | ₹2,12,000 |
| 2 | Supplying of primer of Choksey make for Flexopatch or equivalent of approved make ) for Elastomeric concrete compund at site. | 53 | ltr. | 100 | ₹5,300 |
| 3 | Supplying of primer (RDL-942 of Choksey Chemicals / 105 of D.S Brown or equivalent approved make ) for Polysulphide sealant for joints at site. | 105 | ltr. | 10 | ₹1,050 |
| 4 | Repairing of damaged portion of rigid pavement with Elastomeric concrete compound (Flex-O-Patch of Choksey chemicals/ Delpatch of D.S Brown or equivalent) after marking, cutting, chipping the pavement up to required size by using mechanical chippers, side locking on the vertical face, cleaning the prepared area by sand blasting with medium grit sand, masking and pouring the compound, finishing & texturing complete as per manufacturer specifications and the direction of EIC with required machines & tools.
Note: The rate quoted shall be exclusive of cost of flexo Item no. 1 Primer RDL-942 | 2,000 | kg | 10 | ₹20,000 |
| 5 | Cleaning of existing expansion joints and providing & filing with polysulphide joint sealing compound (confirming to grade BS:5212, Part-I, 1990) of Dr. Fixit or equivalent including painting the side of slab with approved primer and filling the groove 25 mm or more in width as per actual joint width status at site x 45mm deep ( inc. of backer rod depth) including inserting the backer rod of Supreme or equivalent of appropriate dia (minimum 30mm or more as per actual joint width status at site) of approved make to receive the specified sealing compound, providing and applying bond breaking tape on top edges of joint to prevent accidental spillage of sealant on top surface and to give a neat finish to the sealant has been applied and tooled, all complete as per specification and direction of EIC.
Note: The rate quoted shall be exclusive of cost of Item no. 3 | 2,000 | mtr | 10 | ₹20,000 |
| 6 | Cleaning of existing dummy/construction joints and providing & filling with polysulphide joint sealing compound (confirming to grade BS: 5212, Part-I, 1990) of approved make Dr. Fixit or equivalent including painting the sides of slab with approved primer and filling the groove 10mm or more in width as per actual joint width status at site x 25mm deep ( inc. of backer rod depth) including inserting the backer rod of Supreme or equivalent of appropriate dia minimum 12mm or more, of approved make to receive the specified sealing compound, providing and applying bond braking tape on top edges of joint to prevent accidental spillage of sealant on top surface and to give a neat finish to the sealant has been applied and tooled, all complete as per specification and direction of EIC.
Note: The rate quoted shall be exclusive of cost of Item no. 3 | 3,000 | mtr | 100 | ₹3,00,000 |
| 7 | Supply of SW-CRETE T-02 or equivalent high performance thin layer rapid repair compound. Material should be self-flowing having compressive strength after 2 hrs. 20MPA after 1 day - 30 MPA after 28 days 50 MPA. Pull strength after 28 days - 1.0 MPA. (Minimum) Expansion rate 0.10%. (maximum). Curing time should be 2 hrs. to accept traffic as per specifications and directions of Engineer-in-Charge. | 3,300 | kg | 10 | ₹33,000 |
| 8 | Laying of SW-CRETE T-02 or equivalent high performance thin layer rapid repair compound. Material should be self-flowing having compressive strength after 2 hrs. 20MPA after 1 day - 30 MPA after 28 days 50 MPA. Pull strength after 28 days - 1.0 MPA. (Minimum) Expansion rate 0.10%. (maximum) . Rate inclusive of milling the old surface area for required depth & matching with the existing profile, cleaning with compressed air, high pressure water jet cleaning, mixing of SW-CRETE T-02 in machine, pouring, finishing, texturing, curing time should be 2 hrs. to accept traffic as per specifications and directions of Engineer-in-Charge.
a) Rate Excluding material cost of Item no. 7 | 3,000 | kg | 10 | ₹30,000 |
stage.html
html • 0.04 MB
technical_307493.pdf
techsummary_307493.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
tenderapron.pdf
Tender Documents • 11.32 MB
BOQ_307493.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .