| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAdmitted-Finance | ₹25.0 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vino Industry L1 |
|---|---|---|---|---|
| 1.00Excavation of Pole/Stay Pit | ||||
| 2.00 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual | 200 | Each | 450 ₹90,000 |
| 3.00 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual | 150 | Each | 550 ₹82,500 |
| 4.00 | Hard rock without blasting (where houses are located) | 10 | Each | 1,500 ₹15,000 |
| 5.00 | Stay pit 4.5' to 5' depth by using JCB or manual | 120 | Each | 450 ₹54,000 |
| 6.00Erection of poles. | ||||
| 7.00 | PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | 200 | Each | 550 ₹1.1 L |
| 8.00 | PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual | 150 | Each | 650 ₹97,500 |
| 9.00 | Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or manual | 10 | Each | 650 ₹6,500 |
| 10.00 | Erection of stay set complete | 120 | Each | 240 ₹28,800 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
23 Feb 2026, 2:30 pmClosed
SE/SEDC/SLM
o/o of the SE/SEDC/SLM
Works contract for Execution of extension Improvement DCW and various works in Attayamapatty Sub Division in respect of South Division
2026_EB_659495_1
SE/SEDC/WC.056/25-26dt.17.2.26
Open Tender
Electrical and Maintenance Works
365 days
South division
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
26 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Excavation of Pole/Stay Pit
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of poles.
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual
Erection of stay set complete
Transport of Poles road side to pole pit including loading and unloading
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms (Plains)
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Loading and unloading of poles:
Loading of poles upto 8.0 M/ 27
Unloading of poles upto 8.0 M/27
Loading of poles above 8.0 M
Unloading of Poles above 8.0 M
Fixing of Cross Arms
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Guarding Cross arm
LT 3 phase cross arms
LT Single phase cross arms
Fixing of Aluminium Knob
Fixing of HT pin Insulators 22 KV
Fixing of LT pin Insulator
Fixing of LT shackle
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
Cable sizes of 4x25 Sq.mm
Cable sizes of 4x120 Sq.mm
Guarding arrangements:
Concreting of poles:
Earthing of pole with coil earthing including burying looping and binding
Painting
Erection of Transformer
Lathe Works
Drilling of hole in channel only 3/4" & 1"
Re-sagging of HT/LT lines
Service Erected:
Releasing of single phase service and re-fixing.
Tree cutting works
Cutting of coconut leaves (per tree)
Clearing of branches of trees
DT/ DP erection
Dismantling of Line Materials
Dismantling of Single pole Transformer Structure complete
Dismantling of D.P Structure complete
Dismantling of pole from pole pit (9.0m and above)
Dismantling of pole from pole pit (7.5mtr & 8mtr)
Dismantling of pole (9.0m and above)
Dismantling of pole (7.5mtr & 8mtr)
Dismantling of HT 22 KV Pin Insulator
Dismantling of HT TI Fitting
Dismantling of11 KV disc
Dismantling of 22 KV disc
Dismantling of 3 PH X arm
Dismantling of V X arm
Dismantling of Tapping X arm, V X arm & Guarding X arm
Dismantling of 1 PH X arm
Dismantling of Alu Knob
Dismantling of LT pin Insulator
Dismantling of LT Shackle Insulator
Stay set complete Dismantling
Dismantling of 7/4.09 mm ACSR conductor
Dismantling of 7/3.35 mm ACSR conductor
Dismantling of 7/2.59 & 7/2.11 mm ACSR conductor
Dismantling of Guarding
Dismantling of St light fitting
Dismantling of st light SC
G.S.T. @18% should be Entered by the Bidder
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_791272.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid