| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical GRAM DATTOLI MUGHAL POST BEHDA SANDAL SINGH SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | Accepted-Technical Bid accepted by commitee |
| 2 | Accepted-Technical M 287 GANGA NAGAR MAWANA ROAD MEERUT | Accepted-Technical Bid accepted by commitee |
| 3 | Accepted-Technical 19 NEW PARBHAT NAGAR MEERUT | Accepted-Technical Bid accepted by commitee |
Tender Value
₹1.3 Cr
EMD Value
₹8.5 L
Closing Date
7 Oct 2026, 2:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Construction work of New Bridge in place of Narrow/Damaged culvert at Km-11 of Barnawa road (ODR) via Chhaprauli-Kishanpur Biral-Gangnauli-Doghat- Pusar road in Bagpat district under the FY 2026-27
2026_CEMRT_1191598_1
3853/11Cashier-MC PD Baghpat Dt 05-09-2026
Open Tender
Civil Works - Bridges
Percentage
300 days
EE PD PWD BAGHPAT
CLASS A,B
3 documents required · 3 mandatory
₹2,714
₹8.5 L
SE MEERUT CIRCLE PWD MEERUT
12 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) required for proper completion of work as per direction of Engineer-in-Charge. SI No. 692. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 182 | Cum | 400 | ₹72,800 |
| 2 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). SI No. 694. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 106 | Cum | 1,000 | ₹1,06,000 |
| 3 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) Including cost of all material labour T&P etc (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) required for proper completion of work as per direction of Engineer-in-Charge. SI No. 251. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 780 | Cum | 90 | ₹70,200 |
| 4 | PCC Grade M 15 (1:2:4) Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical specifications. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 132 | Cum | 6,878 | ₹9,07,896 |
| 5 | Plain/Reinforced Cement Concrete for wall & Slab etc. as per Drawing and Technical Specifications. RCC Grade M-30. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 346 | Cum | 8,186 | ₹28,32,356 |
| 6 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(foundation). RCC Grade M-30. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 186 | Cum | 7,536 | ₹14,01,696 |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. Including cost of all material labour T&P etc (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) required for proper completion of work as per direction of Engineer-in-Charge. SI No. 504 | 501 | Qtl | 7,869 | ₹39,42,369 |
| 8 | Empty cement bags, Providing & fixing empty cement bags filled with carted earth upto 1.00 km. lead, hand sewing with suja & sutli and placing in position within 60m. Including cost of E.C.Bags, all labour, material and T&P required for proper completion to work SOR No New Item-16 10.29. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 300 | Nos | 18 | ₹5,400 |
| 9 | PCC Grade M 20 (1:1.5:3) Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 181 | Cum | 7,387 | ₹13,37,047 |
| 10 | Supply and fixing of 10cm. (4") internal dia for 10.0 cm. PVC down pipe Everest or charminar make complete with bends with door at top and plain at bottom and grantings and including supply of neary M.S. clamp 2.5cm x 3 mm. (1" x1/8") fixed to walls with cement motar (1:2) and including supply of 15 cm (6") long 6mm. (1/4") dia nail all materials, labour and T& P. etc. required for proper completion of the work and also including repair of plaster pointing etc. if damaged during fixing of the pipes. Including cost of all material labour T&P etc (Including Upkar, Levy fee, Toll and Royality but excluding G.S.T.) required for proper completion of work as per direction of Engineer-in-Charge. SI No. 730a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 60 | R.M. | 370 | ₹22,200 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.36 MB
BOQ_2247890.xls
BOQ • 0.27 MB
4173.pdf
PDF • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .