| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance | -0.25% | ₹10.8 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 L+₹863.64 (0.08%)Admitted-Finance | -0.17% | ₹10.8 L+₹863.64 (0.08%) | L2 | Admitted-Finance |
| 3 | L3₹10.8 L+₹1,835.24 (0.17%)Admitted-Finance | -0.08% | ₹10.8 L+₹1,835.24 (0.17%) | L3 | Admitted-Finance |
Tender Value
₹10.8 L
EMD Value
₹53,925
Closing Date
30 Apr 2026, 2:00 pmClosed
PO DUDA BIJNOR
O/O PO DUDA BIJNOR
NP JALALABAD K WARD 11 MOH MAHAL SARAI MAI VAZID KI DUKAN SE NALKUP TAK CC ROAD NALI
2026_SUDA_1140587_1
39
Open Tender
Civil Works
Percentage
90 days
BIJNOR
PLEASE REFER TEDNER DOCUMENT
2 documents required · 2 mandatory
₹854
PO DUDA BIJNOR
₹53,925
2 May 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W Excavation in Foundation in Ordinary Soil i/c 1.5m lift and 30m Lead i/e all Complete.S.I.No. 251 | 500 | M2 | 70 | ₹35,000 |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 | 40 | M3 | 183.5 | ₹7,340 |
| 3 | R.C.C. work with cement C-sand and stone grit in 1:1.5:3 in lintels etc excluding s/o rainforcement and its binding but including fixing binding centering and shuttering including supply of all materials labourand T&P etc required for proper completion of the work as per S.I.No.-288 | 3.45 | M3 | 620 | ₹2,139 |
| 4 | M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 305 | 634.8 | Nos | 5.8 | ₹3,681.84 |
| 5 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279a | 2.07 | M3 | 1,150 | ₹2,380.5 |
| 6 | Supply and fixing of vitrefied Tiles 600X600 mm size in flooring with 1:3 including supply of all material,labour and T&P etc.required for proper completion of work ch. 14 s.i. no new item no (4) | 14 | M3 | 6,850 | ₹95,900 |
| 7 | 12 MM thick Plaster with one part of cement and four part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 584. | 27.6 | M3 | 5,110 | ₹1,41,036 |
| 8 | M.S. or Iron work in plain work such as R.C.C. (1: 2 : 4 ) or R.B. work as per complete S.I.no.502(b) | 120 | M2 | 204 | ₹24,480 |
| 9 | Mild Steel or Iron work in Febrication of gate S.I NO.502C. | 40 | M3 | 2,786 | ₹1,11,440 |
| 10 | Providing Wall Putty on new surface with approvel quality material of berjer/j.k./birla etc make 2 coatesi/c all etc complete chapter no.15 New Item -11 | 60 | M3 | 7,441 | ₹4,46,460 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2129957.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .