Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.0 CrAdmitted-Finance | -19.00% | ₹11.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.6 Cr+₹54.6 L (4.94%)Admitted-Finance | -15.00% | ₹11.6 Cr+₹54.6 L (4.94%) | L2 | Admitted-Finance |
| 3 | L3₹12.1 Cr+₹1.1 Cr (9.68%)Admitted-Finance | -11.16% | ₹12.1 Cr+₹1.1 Cr (9.68%) | L3 | Admitted-Finance |
| 4 | L4₹12.3 Cr+₹1.2 Cr (11.1%)Admitted-Finance | -9.99% | ₹12.3 Cr+₹1.2 Cr (11.1%) | L4 | Admitted-Finance |
| 5 | L5₹12.7 Cr+₹1.6 Cr (14.8%)Admitted-Finance 26 98 2ND FLOOR RAILWAY BAZAR RAILWAY BAZAR RAILWAY BAZAR HALDWANI NAINITAL UTTARAKHAND 263139 UDYAM UK 07 0004605 | NAINITAL | UTTARAKHAND | 263139 | -6.98% | ₹12.7 Cr+₹1.6 Cr (14.8%) | L5 | Admitted-Finance |
Tender Value
₹13.6 Cr
EMD Value
₹23.6 L
Closing Date
8 Apr 2022, 3:30 pmClosed
DIG ITB POLICE SHQ(LKB)
SHQ Likabali, Indo Tibetan Border Police Force, Upper Colony, Likabali, Distt-Lower Siang (A.P.) Pin -791125
Construction of 02 Nos 120 Men Barracks and 16 nos Type -II Quarters with site development work 31st Bn ITBP at Yupia ( Arunachal Pradesh ) (SH- Remaining balance structural and finishing works)
2022_ITBP_680467_1
NO. ITBP/SHQ (LKB)/ENGR/TENDER /2022 -142
Open Tender
Civil Works - Buildings
Percentage
450 days
31ST BN ITBP CAMPUS YUPIA.
AS PER TENDER NOTICE
3 documents required · 3 mandatory
₹0
₹23.6 L
3 Mar 2025
26 Mar 2022
9 Apr 2022
26 Mar 2022
8 Apr 2022
26 Mar 2022
26 Mar 2022 - 8 Apr 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | By Mechanical Transport including loading,unloading and stacking Earth, Lead - 1 km | 23,658.13 | cum | 160.07 | ₹37,86,956.87 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil | 23,969.33 | cum | 221.91 | ₹53,19,034.02 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 41.82 | cum | 307.88 | ₹12,875.54 |
| 4 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 392 | metre | 444.43 | ₹1,74,216.56 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 364.66 | cum | 268.04 | ₹97,743.47 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 62.42 | cum | 7,637.98 | ₹4,76,762.71 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 37.08 | cum | 7,065.05 | ₹2,61,972.05 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 67.46 | cum | 6,736.42 | ₹4,54,438.89 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : Making plinth protection 50mm thick of cement
concrete 1:3:6 (1 cement : 3 coarse sand derived
from natural sources : 6 graded stone aggregate
20 mm nominal size derived from natural
sources) over 75mm thick bed of dry brick ballast
40 mm nominal size, well rammed and
consolidated and grouted with fine sand, including
necessary excavation, levelling & dressing &
finishing the top smooth. | 251.96 | sqm | 749.33 | ₹1,88,801.19 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 151.88 | cum | 9,418.58 | ₹14,30,493.93 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 38.04 MB
BOQ_716135.xls
BOQ • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .