| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹21.3 Cr+₹1.1 Cr (5.68%)Admitted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | L2 | Admitted-Finance | |
| 3 | L3₹22.3 Cr+₹2.1 Cr (10.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹25.0 Cr+₹4.8 Cr (23.7%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Ramnaryan Rameshwarlal L1 | M/S Shree Karni traders L3 | BABU LAL AND COMPANY L4 | krishna and Company L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting Juli Flora /sarkanda
Uprooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 75,000 | Sqm | 0.5 ₹37,500 Lowest | 2 ₹1,50,000 | 1.75 ₹1,31,250 | 0.75 ₹56,250 |
| 2.00 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 30 Cm. to below 60 Cm. Girth | 500 | Each | 20 ₹10,000 | 100 ₹50,000 | 100 ₹50,000 | 5 ₹2,500 Lowest |
| 3.00 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 60 Cm. to below 120 Cm. Girth | 250 | Each | 20 ₹5,000 | 250 ₹62,500 | 400 ₹1,00,000 | 5 ₹1,250 Lowest |
| 4.00 | Silt Clearance/ Removal of blown sand/ Berm Unloading undressed with combined lead upto 50 m. for lined canal section.
For FSD more than 2 m. | 2,737 | Cum | 25 ₹68,425 Lowest | 30 ₹82,110 | 25 ₹68,425 Lowest | 40 ₹1,09,480 |
| 5.00 | Earthwork excavation for Lip Cutting in ordinary soil for disty. & minors having vertical height upto 0.75 m., kassi work including rehandling with dressing of earthwork. | 16,431.09 | Cum | 25 ₹4,10,777.25 Lowest | 30 ₹4,92,932.7 | 25 ₹4,10,777.25 Lowest | 25 ₹4,10,777.25 Lowest |
| 6.00 | Earth work excavation in ordinary soil for distributaries and minors having discharge less than 10 cumecs; Kassi work undressed. | 1,25,223.54 | Cum | 25 ₹31,30,588.5 | 45 ₹56,35,059.3 | 20 ₹25,04,470.8 Lowest | 30 ₹37,56,706.2 |
| 7.00 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary. for command area | 40,198.17 | Cum | 10 ₹4,01,981.7 | 10 ₹4,01,981.7 | 20 ₹8,03,963.4 | 5 ₹2,00,990.85 Lowest |
| 8.00 | Extra on earthwork for laying in 15 to 25 cms layers including Dressing & Watering as per specifications (Water to be made available by the department at one place of work site). | 58,819.31 | Cum | 5 ₹2,94,096.55 Lowest | 10 ₹5,88,193.1 | 7 ₹4,11,735.17 | 5 ₹2,94,096.55 Lowest |
| 9.00 | Compaction of earthwork by mechanically operated Vibro-Compactor/ any other mechanical means to attain a density 95% of Maximum Dry Density. | 58,819.31 | Cum | 8 ₹4,70,554.48 | 30 ₹17,64,579.3 | 18 ₹10,58,747.58 | 3 ₹1,76,457.93 Lowest |
| 10.00 | Dressing of earthwork. | 69,831.3 | Cum | 5 ₹3,49,156.5 | 2 ₹1,39,662.6 | 1 ₹69,831.3 | 0.3 ₹20,949.39 Lowest |
Tender Value
₹21.7 Cr
EMD Value
₹43.5 L
Closing Date
17 Jul 2024, 6:00 pmClosed
Chief Engineer
Office of the Chief Engineer Water Resources(North) Hanumangarh
Rehabilitation of different reaches of various canals of Nohar Irrigation Project Part-II sub-project, District Hanumangarh
2024_WRDAS_394001_6
CE_NIB_01_2024-25
Open Tender
Civil Works
Item Rate
1095 days
Nohar
As per bid documents
3 documents required · 3 mandatory
₹10,000
Executive Engineer, Water Resources Division
₹43.5 L
Hanumangarh
17 Sept 2024
13 Jun 2024
18 Jul 2024
13 Jun 2024
17 Jul 2024
13 Jun 2024
24 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Juli Flora /sarkanda
Uprooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 75,000 | Sqm | - | - |
| 2 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 30 Cm. to below 60 Cm. Girth | 500 | Each | - | - |
| 3 | Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 60 Cm. to below 120 Cm. Girth | 250 | Each | - | - |
| 4 | Silt Clearance/ Removal of blown sand/ Berm Unloading undressed with combined lead upto 50 m. for lined canal section.
For FSD more than 2 m. | 2,737 | Cum | - | - |
| 5 | Earthwork excavation for Lip Cutting in ordinary soil for disty. & minors having vertical height upto 0.75 m., kassi work including rehandling with dressing of earthwork. | 16,431.09 | Cum | - | - |
| 6 | Earth work excavation in ordinary soil for distributaries and minors having discharge less than 10 cumecs; Kassi work undressed. | 1,25,223.54 | Cum | - | - |
| 7 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary. for command area | 40,198.17 | Cum | - | - |
| 8 | Extra on earthwork for laying in 15 to 25 cms layers including Dressing & Watering as per specifications (Water to be made available by the department at one place of work site). | 58,819.31 | Cum | - | - |
| 9 | Compaction of earthwork by mechanically operated Vibro-Compactor/ any other mechanical means to attain a density 95% of Maximum Dry Density. | 58,819.31 | Cum | - | - |
| 10 | Dressing of earthwork. | 69,831.3 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BiD_DoC_B_SiD.pdf
Tender Documents • 3.80 MB
BOQ_706274.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .