| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 CrAccepted-AOC WARD NO 01 KORBA DARRI ROAD DARRI ROAD VILLAGE TOWN KORBA CITY KORBA KORBA CHHATTISGARH 495677 INDIA | KORBA | CHHATTISGARH | 495677 | ₹1.7 Cr Quoted ₹1.5 Cr | L-1 | Accepted-AOC Due to L-1 bidder |
| 2 | L-2₹1.8 Cr+₹27.7 L (18.7%)Rejected-Finance 154 I C C T P NAGAR KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹1.8 Cr+₹27.7 L (18.7%) | L-2 | Rejected-Finance Due to L-2 bidder |
| 3 | L-3₹2.1 Cr+₹61.6 L (41.7%)Rejected-Finance | ₹2.1 Cr+₹61.6 L (41.7%) | L-3 | Rejected-Finance Due to L-3 bidder |
| 4 | L-4₹2.1 Cr+₹62.8 L (42.5%)Rejected-Finance 120 RAMAYAN KOSABADI DIST KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | ₹2.1 Cr+₹62.8 L (42.5%) | L-4 | Rejected-Finance Due to L-4 bidder |
| 5 | Rejected-Technical HOUSE NO B 565 PRAGATI NAGAR DIPKA KORBA KORBA CHHATTISGARH 495452 | KORBA | CHHATTISGARH | 495452 | - | - | Rejected-Technical All confirmatory document Not submitted, hence rejected |
Tender Value
₹2.3 Cr
EMD Value
₹2.9 L
Closing Date
4 Dec 2023, 5:00 pmClosed
GM CIVIL GEVRA AREA
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534065
Dust Suppression by Truck Mounted Tankers(Minimum 9/12/15/18 KL capacity) on CC road(Road sale roads) from surakeha chowk to barrier no. 3 Old Dipka Unit of Gevra Project of Gevra Area. (Scope of work under dust suppression by mobile water tanker enc
2023_SECL_293961_1
SECL/GA/GM(C)/ETN/23-24/103 dtd. 16.11.2023
Open Tender
Civil Works - Others
Item Rate
365 days
Gevra Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.9 L
11 Feb 2024
18 Nov 2023
6 Dec 2023
18 Nov 2023
4 Dec 2023
19 Nov 2023
18 Nov 2023 - 27 Nov 2023
Amount
Item Description/ Heading
Dust suppression of road surface using 9/12/15/18 KL capacity tanker to keep the road surface properly wet including hiring charges of tankers.All the tools and plants,payment of drivers,cost of POL etc.All complete as per instruction of engineer-in-charge as detailed below(in all 03(three)shifts.From July to Sep 3 times(1st shift-1 time,2nd shift-1 time and 3 shift 1 time)From Oct to Jan-5 times(1st shift-2 time,2nd shift-2 time and 3 shift 1 time).From Feb to June 8 TIMES(1st shift-3 time,2nd shift-3 time and 3rd shift 2 time).NOTE (1) Minimum 03 nos tankers of 9/12/15/18KL or equivalent capacity each required to be engaged during July to Sep.(2) 05 nos tankers from Oct to January of 9/15/18 KL Capacity.(3) 08 nos tankers from Feb to June of 9/12/15/18 KL Capacity.and additional 2 nos stand by tanker has to be provided by the agency during full claim period.(Tanker 9000. capacity or equivalent for calculation purpose as required).(4) Bidders are requested to quote their rate as per scope of work enclosed in NIT.(5) Tankers shall be allowed to be deployed after checking the road worthiness by E&M Department.(6) 45 days period out of year is to be considered for wet days on which dust suppression may not be required.(7) Approximate no. of trips considered for each session, but actual trip may vary as per site condition.(8) The tanker shall be fitted with GPS is to be submitted for bill preparation & payment.
Total impact of GST for the purpose of CTC
M.K. Gupta and Company
U.K. Singh
VERITY INDIA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .