Tender Value
₹19.0 L
EMD Value
₹19,500
Closing Date
24 May 2024, 12:00 pmClosed
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Repairing of VCB Pannel and other Instrument etc work in area of EDD-II Hapur in business Plan
2024_PVVNL_924036_1
142(W)/EDCH/2023-24
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹3,540
SE, EDC, Hapur
₹19,500
27 May 2024
3 May 2024
24 May 2024
3 May 2024
24 May 2024
3 May 2024
Amount
FOR REPAIRING/REPLACMENT OF JARJAR VCB AND OHTHER ASSOCIATED WORKS, IN BUSINESS PLAN (2024-25), IN THE AREA OF EDD-II HAPUR, UNDER EDC., HAPUR. (Third party inspection of the quality of all works will be conducted by the department.)
Carriage of all petty material of estimate, from Electricity store center, Hapur to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of all cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends, as per direction of site incharge.
Carriage of new 11KV incoming VCB-11No., and 11KV outgoing VCB-30Nos., from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV CT Outdoor 33KV CTR 200/100/1, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV VCB 750MVA-1250A, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV VCB 750MVA-800A, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV VCB 1200A, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of 33KV control Pannel for double circuit from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Dismantling of old & jarjar 11KV incoming/outgoing VCB, from existing place in control room and shifting the same outside the control room at 33/11KV Sub-Stations, including removal all connections, as per direction of site incharge.
Dismantling of old & jarjar 33KV incoming/outgoing VCB, from existing place in control room and shifting the same outside the control room at 33/11KV Sub-Stations, including removal all connections, as per direction of site incharge.
Carefully & safely shifting of 11KV incoming VCB-11Nos. & 11KV outgoing VCB-27Nos., from outside to inside the switchgear room at the place of removed VCB's and erection/Installation of 11KV VCB's after fixing of anchor GI nuts & bolts of proper size for completion of energisation work by providing required fixing material, as per RESPO/Drawing Norms, and as per direction of site incharge.
Carefully & safely shifting of 33KV VCB 750MVA-1250A from outside to inside the switchgear room at the place of removed VCB's and erection/Installation of 33KV VCB's after fixing of anchor GI nuts & bolts of proper size for completion of energisation work by providing required fixing material, as per RESPO/Drawing Norms, and as per direction of site incharge.
Carefully & safely shifting of 33KV VCB 750MVA-800A from outside to inside the switchgear room at the place of removed VCB's and erection/Installation of 33KV VCB's after fixing of anchor GI nuts & bolts of proper size for completion of energisation work by providing required fixing material, as per RESPO/Drawing Norms, and as per direction of site incharge.
Carefully & safely shifting of 33KV VCB 1200A from outside to inside the switchgear room at the place of removed VCB's and erection/Installation of 33KV VCB's after fixing of anchor GI nuts & bolts of proper size for completion of energisation work by providing required fixing material, as per RESPO/Drawing Norms, and as per direction of site incharge.
Mounting, Placing and connecting of all connections of 33KV CT Outdoor 33KV CTR 200/100/1, and completion work properly by providing required matrial, as per RESPO Norms and as per direction of site incharge.
Erection/Installation of 33KV Control Pannel double circuit after fixing of anchor GI nuts & bolts of proper size for completion of work by providing required material, as per RESPO/Drawing Norms and as per direction of site incharge.
Installation of Battery set and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge.
Installation of Battery Charger set and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge.
Erection & Fixing of 33KV. Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge.
Erection and Fixing of 33KV Lightening Arrestor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
Erection and Fixing of 33KV Line Isolastor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
Erection and Fixing of 33KV Bus Isolastor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge.
Laying of 11KV HT XPLPE Cable 3x300Sqmm., and completion of work properly as per RESPO/Norms, including by providing required fixing materials, as per direction of site incharge.
Laying of Copper Control Cable 4x2.5Sqmm., and completion of work properly as per RESPO/Norms, including by providing required fixing materials, as per direction of site incharge.
Laying of Copper Control Cable 2x2.5Sqmm., and completion of work properly as per RESPO/Norms, including by providing required fixing materials, as per direction of site incharge.
Erection and fixing of Structur for suitable of CT Outdoor/33KV VCB after fabrication of Channel/Angle, including by providing fixing all materials and completion work properly, as per direction of site incharge
Carriage of old and jarjar 11KV incoming VCB from 33/11KV Sub-Station/ site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of old and jarjar 33KV incoming VCB from 33/11KV Sub-Station/ site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Dismantling work and carriage of old and jarjar scrap Battery set-180Kg., and Iron scrap-220Kg. from 33/11KV Sub-Station/ site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge.
M S Electricals
Singh Heavy Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .