| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 CrAdmitted-Finance MASIPIRHI RANCHI PATNA ROAD OPP REPUBLIC MAHINDRA TRACTOR SHOWROOM NH 33 HAZARIBAGH JHARKHAND 825301 | HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | +4.90% | ₹6.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.0 Cr+₹57,442.53 (0.10%)Admitted-Finance M 13 S S HARMU HOUSING COLONY PS ARGORA PO DORANDA RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | +5.00% | ₹6.0 Cr+₹57,442.53 (0.10%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | KHUNTI | JHARKHAND | 835209 | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹5.8 Cr
EMD Value
₹11.7 L
Closing Date
20 Jan 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
RWD, WORKS DIVISION, HAZARIBAG
Construction of Road From Vill. Chirudih to Hesabar (L-4.500 Km.)
2025_RWD_97450_1
13/2024-25/RWD/EE/HAZARIBAG
Open Tender
Civil Works
Percentage
365 days
HAZARIBAG
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹11.7 L
6 Jun 2026
9 Jan 2025
21 Jan 2025
9 Jan 2025
20 Jan 2025
9 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 1.9 | Ha | 19,760.3 | ₹37,544.57 |
| - | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) | 1.9 | Ha | 88,499.5 | ₹1,68,149.05 |
| - | Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) | 5,620.35 | M3 | 52.6 | ₹2,95,630.41 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 9,141.55 | M3 | 131.3 | ₹12,00,285.52 |
| - | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
Including Royalty etc@ Rs. 27.48 per cum but excluding the cost of watering, rolling & compaction. | 120 | M3 | 62.4 | ₹7,488 |
| - | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)
Rolling with smooth wheeled roller | 4,121.15 | M3 | 61.48 | ₹2,53,368.3 |
| - | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 2,598.24 | M3 | 2,925.56 | ₹76,01,307.01 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 2,069.16 | M3 | 3,197.5 | ₹66,16,139.1 |
| - | Prime coat (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.) | 13,263.83 | M2 | 81.58 | ₹10,82,063.25 |
| - | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. | 13,263.83 | M2 | 12.96 | ₹1,71,899.24 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
SBD01.pdf
Tender Documents • 1.12 MB
BOQ_131023.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .