Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | ₹17.0 L | L1 | Accepted-AOC ok |
| 2 | L2₹18.0 LRejected-AOC | ₹18.0 L | L2 | Rejected-AOC Raject |
| Sl No | Description | Qty | Unit | B SUGUNA L2 | M/S. GPS BUILDEERS L1 |
|---|---|---|---|---|---|
| 1.001.Providing CC road at Kailash nagar 1st main road in Nadukuthagai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 22.77 | CUM | 150 ₹3,416 | 131 ₹2,983 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 35.46 | CUM | 3,500 ₹1.2 L | 2,900.5 ₹1.0 L |
| 4.00 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 104.74 | CUM | 6,500 ₹6.8 L | 5,907 ₹6.2 L |
| 5.00 | CC 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete | 93.36 | CUM | 7,314.17 ₹6.8 L | 7,314.17 ₹6.8 L |
| 6.00 | Towards Centring charges for planks including rend and labour charges etc. complete. | 227.7 | sqm | 136.88 ₹31,168 | 136.88 ₹31,168 |
| 7.00 | Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete. | 16.79 | Sqm | 234.3 ₹3,934 | 234.3 ₹3,934 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,74,732.02 ₹2.7 L | 2,59,647.66 ₹2.6 L |
Tender Value
₹17.5 L
EMD Value
₹18,000
Closing Date
25 Sept 2025, 3:00 pmClosed
Block Development office BP
Poonamallee union
Providing CC road at Kailash nagar 1st main road in Nadukuthagai Panchayat
2025_RDTN_607461_1
SFC DP 25-26-01
Open Tender
Civil Works
poonamallee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,000
Yes
Block Development office BP
1 Feb 2026
22 Sept 2025
25 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
22 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_726015.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid