| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC | ₹22.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹23.1 L+₹61,767.65 (2.75%)Rejected-AOC | ₹23.1 L+₹61,767.65 (2.75%) | L2 | Rejected-AOC Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | BJ Construction L1 | NMS ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation of building in kind of soilsand sup soilsand full depth as may be directed by the departmental officers with initial lift and leads and cleaning and leveling the site. | 70 | m3 | 200 ₹14,000 Lowest | 200 ₹14,000 Lowest |
| 2.00 | Cement concrete 1:4:8(one cement,four sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted | 31 | m3 | 5,000 ₹1,55,000 Lowest | 5,350 ₹1,65,850 |
| 3.00Supplying and erection shuttering,including necessary supports for plain in all floors using mild steel sheets of size 90x 60 cms and BG 10 stiffed with surfacewelded mild steel angles for boarding supported by casuarina props at suitable intervals etc. completecomplying with standard specifications as directed | |||||
| 3.01 | For Plinth Beam | 15 | m2 | 450 ₹6,750 Lowest | 980 ₹14,700 |
| 3.02 | For Lintel Beam Slab | 30 | m2 | 450 ₹13,500 Lowest | 1,050 ₹31,500 |
| 3.03 | For Vertical Walls | 53 | m2 | 450 ₹23,850 Lowest | 700 ₹37,100 |
| 4.00 | Cement Concrete 1:1.5:3 (one cement,one and half sand and three aggregate)using 20mm gauge hard broken granite stone jelly for all RCC items of work excluding centring, shutteringand cost of reinforcement grill but including fixing fan clamps and fixtures in RCC works wherever necessary as per the direction of departmental officers complete | 16 | m3 | 7,500 ₹1,19,996.25 Lowest | 9,400 ₹1,50,395.3 |
| 5.00 | Cement concrete 1:2:4 (one cement, Two sand and Four aggregate ) using 20mm hard broken granite stone jelly for All PCC items of work etc., complete fixturas directed by departmental officer . | 4.6 | m3 | 6,800 ₹31,246 Lowest | 7,050 ₹32,394.75 |
| 6.00 | Supplying,fixing and placing in position mild steel /ribbed torsteel rods for all RCC works including cost of steel and binding wire also in all floors,complete complying with standard specifications(upto 16mmdia rods) | 15 | qtl | 90 ₹1,350 Lowest | 9,150 ₹1,37,250 |
| 7.00 | Fly Ash Brick Work in CM 1:4 (One Cement & Four Sand) Using Size 9"x4 3/8"x2 3/4" Including Finishing,Curing,Etc., Complete complyingwith Standard specification. | 9 | m3 | 6,000 ₹53,970 Lowest | 6,960 ₹62,605.2 |
Tender Value
₹29.9 L
EMD Value
₹29,950
Closing Date
9 Jun 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Improvement Works and Supplying of Kitchen accessories to the Amma Unavagam at Poo Market , Mettupalayam road in ward no.72 of west zone.
2026_MAWS_678385_1
e35/2026- Two Cover
Open Tender
Civil Works
Works
60 days
Coimbatore corporation
As per Tender Document
4 documents required · 4 mandatory
₹0
₹29,950
25 Aug 2026
27 May 2026
10 Jun 2026
27 May 2026
9 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of building in kind of soilsand sup soilsand full depth as may be directed by the departmental officers with initial lift and leads and cleaning and leveling the site. | 70 | m3 | - | - |
| 2 | Cement concrete 1:4:8(one cement,four sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted | 31 | m3 | - | - |
| 3Supplying and erection shuttering,including necessary supports for plain in all floors using mild steel sheets of size 90x 60 cms and BG 10 stiffed with surfacewelded mild steel angles for boarding supported by casuarina props at suitable intervals etc. completecomplying with standard specifications as directed | |||||
| 3.01 | For Plinth Beam | 15 | m2 | - | - |
| 3.02 | For Lintel Beam Slab | 30 | m2 | - | - |
| 3.03 | For Vertical Walls | 53 | m2 | - | - |
| 4 | Cement Concrete 1:1.5:3 (one cement,one and half sand and three aggregate)using 20mm gauge hard broken granite stone jelly for all RCC items of work excluding centring, shutteringand cost of reinforcement grill but including fixing fan clamps and fixtures in RCC works wherever necessary as per the direction of departmental officers complete | 16 | m3 | - | - |
| 5 | Cement concrete 1:2:4 (one cement, Two sand and Four aggregate ) using 20mm hard broken granite stone jelly for All PCC items of work etc., complete fixturas directed by departmental officer . | 4.6 | m3 | - | - |
| 6 | Supplying,fixing and placing in position mild steel /ribbed torsteel rods for all RCC works including cost of steel and binding wire also in all floors,complete complying with standard specifications(upto 16mmdia rods) | 15 | qtl | - | - |
| 7 | Fly Ash Brick Work in CM 1:4 (One Cement & Four Sand) Using Size 9"x4 3/8"x2 3/4" Including Finishing,Curing,Etc., Complete complyingwith Standard specification. | 9 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_815020.xls
BOQ • 0.29 MB
TenderDocument.pdf
Tender Documents • 1.30 MB
ITB.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .