| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹4.3 Cr+₹11.8 L (2.80%)Rejected-Finance | ₹4.3 Cr+₹11.8 L (2.80%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹4.6 Cr+₹41.4 L (9.87%)Rejected-Finance 3RD FLOOR CHAPAGURI ROAD PO DISTRICT BONGAIGAON ASSAM | ₹4.6 Cr+₹41.4 L (9.87%) | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹4.9 Cr+₹68.4 L (16.3%)Rejected-Finance SIVA NAGAR PANIGAON P O ITACHALI P S ITACHALI NAGAON PIN 782003 | NAGAON | NAGAON | ASSAM | 782003 | ₹4.9 Cr+₹68.4 L (16.3%) | L4 | Rejected-Finance L4 bidder |
| 5 | Rejected-Technical GHORAMARA GUWAHATI ASSAM | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | N K Construction and Suppliers L1 | ASM BROTHERS L3 | SAURAV PHUKAN L4 | HEMANTA DUTTA L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Planning, Designing, and Construction of RCC framed structure building OF INTEGRATED REVENUE OFFICE (G+1) IN KALIABAR, NAGAON with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 1,050 | Sqm | 30,000 ₹3,15,00,000 | 22,000 ₹2,31,00,000 Lowest | 39,380 ₹4,13,49,000 | 24,000 ₹2,52,00,000 |
| 2.00 | Supplying, Installation, Testing and commissioning of FURNITURE WORKS including handing over complete as per scope of work and directions of Engineer In charge. | 1 | Job | 45,38,936 ₹45,38,936 | 75,00,000 ₹75,00,000 | 25,00,000 ₹25,00,000 Lowest | 30,00,000 ₹30,00,000 |
| 3.00 | Planning, Designing and construction of Civil External development works (B (i-xi) , Boundary Wall, Horticulture & Landscape, gate and guard room, sewerage+effluent treatment plant ,water cooler , water treatment plant with RO , Tubewell and sewage & drainage pump approval of the same by the Engineer- in-Charge | 1 | Job | 23,30,800 ₹23,30,800 Lowest | 40,00,000 ₹40,00,000 | 25,00,000 ₹25,00,000 | 64,36,000 ₹64,36,000 |
| 4.00 | Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , UPS System , LED Street light , CCTV syste , Solar photo voltaic power generation system, Access control system, LAN System , IP Based EPABX system and Emergency Light and Illuminated digital signages with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge. | 1 | Job | 20,42,264 ₹20,42,264 Lowest | 60,00,000 ₹60,00,000 | 24,00,000 ₹24,00,000 | 50,00,000 ₹50,00,000 |
| 5.00 | Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts, (except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. | 1 | Job | 15,48,000 ₹15,48,000 | 55,00,000 ₹55,00,000 | 51,000 ₹51,000 Lowest | 35,00,000 ₹35,00,000 |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
9 Mar 2026, 2:00 pmClosed
CE, PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Construction of Integrated Revenue Office in Kaliabor, Nagaon Assam
2026_PWBNH_51312_1
CE/TB-III(B)/15/2026/02
Open Tender
Civil Works - Building
Item Rate
365 days
Kaliabor
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,400
₹8.4 L
Yes
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
21 Aug 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Planning, Designing, and Construction of RCC framed structure building OF INTEGRATED REVENUE OFFICE (G+1) IN KALIABAR, NAGAON with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | 1.25 | - |
| 2 | Supplying, Installation, Testing and commissioning of FURNITURE WORKS including handing over complete as per scope of work and directions of Engineer In charge. | - | Job | - | - |
| 3 | Planning, Designing and construction of Civil External development works (B (i-xi) , Boundary Wall, Horticulture & Landscape, gate and guard room, sewerage+effluent treatment plant ,water cooler , water treatment plant with RO , Tubewell and sewage & drainage pump approval of the same by the Engineer- in-Charge | - | Job | 100 | - |
| 4 | Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , UPS System , LED Street light , CCTV syste , Solar photo voltaic power generation system, Access control system, LAN System , IP Based EPABX system and Emergency Light and Illuminated digital signages with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge. | - | Job | 53 | - |
| 5 | Low Side Sanitary Fixtures, Fittings, Electrical Fixtures, Fittings, DB’s, Panel etc and any other Capital Equipments and accessories which requires maintenance ESS, DG SETS, TRANSFORMER and as per CPWD Maintenance Manual 2019: Comprehensive maintenance ESS, DG SETS, Transformer units after three year warranty charges/maintenance. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts, (except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. | - | Job | 10 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
SBDINTEGRATEDREVENUEOFFICE.pdf
Tender Documents • 1.80 MB
APPENDIX-IB.pdf
Additional Documents • 0.41 MB
VOLUME-I.rar
Additional Documents • 26.60 MB
BOQ_81515.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .