Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.2 LAccepted-AOC | ₹33.2 L | 1 | Accepted-AOC qualified |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BHARATHI L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in hard stiff clay,except in hardrock reqiring blasting inclusive of shoring shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated soil well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officrs with initial lead and lifts and cleaning, levelling, the site etc., complete as per SS 20B for foundation | 672 | M3 | 1,32,720 ₹1.3 L |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 96 | M3 | 5,56,704 ₹5.6 L |
| 3.00 | Centering for soffits of CC slabs of plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and BG 10 stiffened with MS angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5 cm spaced at about 90 cm c/c and supported by consurina props of 10 cm to 13cm dia spaced of 75cm c/c complying with standard specifications and as directed by the departmentsl officers etc., complete | 1,920 | M3 | 6,81,600 ₹6.8 L |
| 4.00 | Plain Cement Concrete 1:1.5:3 (One cement one and half fine aggregate and three course aggregate) mix using 20mm HBG ISS metal for all RCC items of works excluding centering and shuttering and cost of reinforcement grill but including curing the same and also fixing fan clamps and fixtures in RCC works whereever necessary as directed by the departmental officer etc., complete | 220.8 | M2 | 18,11,884.8 ₹18.1 L |
| 5.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 480 | M3 | 1,39,200 ₹1.4 L |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
11 Nov 2025, 3:00 pmClosed
EXECUTIVE OFFICER
EDAIKAZHINADU TOWN PANCHAYAT
Construction of Strom water Drain AT Ward No.17 Nallur Paguthi in edaikazhinadu town panchayat chengalpattu district
2025_DTP_621573_1
198/2025
Open Tender
Civil Works
EDAIKAZHINADU TOWN PANCHAYAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,000
24 Apr 2026
8 Nov 2025
12 Nov 2025
8 Nov 2025
11 Nov 2025
8 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.19 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_743207.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid