Tender Value
₹1.7 L
EMD Value
₹5,040
Closing Date
14 Jul 2026, 6:00 pm6d left
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O LATRINE/WASHROOM NEAR MASJID UMER AT KHAN MOHALLA BLOCK BRENG
2026_RDPR_314977_6
ENIT55of2026-27
Open Tender
Civil Works
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹5,040
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors (sub to actual). | 1 | No | - | - |
| 0.0 | Earthwork in excavation by manual means in trenches for foundations etc ( exceeding 1.5m in width) and exceeding 10 sqm on plan, depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge, disposed earth to be leveled. | 14.46 | Cum | - | - |
| 0.0 | P/L of stone soling in bed tightly hand packed including carriage and head load. Including plum | 1.35 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including 20% plums. | 1.87 | Cum | - | - |
| 0.0 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.06 | CUM | - | - |
| 0.0 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 3.1 | CUM | - | - |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.34 | CUM | - | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 130 | kg | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work. WALLS, STEPS | 6.69 | SQM | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work. SLABS | 7.32 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1020364.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid