| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹11.0 LAdmitted-Fee/PreQual/Technical/Finance KAMARAJ NAGAR AVADI CHENNAI TAMIL NADU | CHENNAI | CHENNAI | TAMIL NADU | 600071 | H1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | H2₹9.5 L−₹1.5 L (13.8%)Admitted-Fee/PreQual/Technical/Finance | H2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | H3₹8.5 L−₹2.5 L (23.0%)Admitted-Fee/PreQual/Technical/Finance | H3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M Karthik H1 | NANDAKUMAR ENTERPRISES H3 | C N Ramachandran H2 |
|---|---|---|---|---|---|---|
| 1.00 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement | 10 | Sqm | 1,320 ₹13,200 | 1,000 ₹10,000 Lowest | 1,139 ₹11,390 |
| 2.00 | Dadooing walls with Glazed tiles of sizes 300mm X 200mm X 6mm size of approved make and quality and colour Set in cement mortar 1:2 (One part of Cement and two part of Plastering Sand (P- Sand)) over 10 mm base layer plastering and pointing with white cement neatly as directed. | 51 | Sqm | 1,581 ₹80,631 | 1,000 ₹51,000 Lowest | 1,365 ₹69,615 |
| 3.00 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. | 891 | Sqm | 183 ₹1,63,053 | 150 ₹1,33,650 Lowest | 157 ₹1,39,887 |
| 4.00 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 604 | Sqm | 323 ₹1,95,092 | 200 ₹1,20,800 Lowest | 278 ₹1,67,912 |
| 5.00 | Solid PVC Door Shutters using 19 Gauge 19mm MS squaretubes for styles and outer frames. 15mm MS square tubesfor top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using5mm thick solid PVC Sheets for panelling shall rigidly fixedin position including necessary furniture and fittings. Theover all size of styles shall be 50mm x 30mm. The over allsize of top rail, lock rail and bottom rail shall be 75mm x30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter | 7 | Sqm | 3,658 ₹25,606 | 3,000 ₹21,000 Lowest | 3,159 ₹22,113 |
| 6.00 | Dismantling of Existing Plain Cement Concrete | 8 | Sqm | 572 ₹4,576 | 450 ₹3,600 Lowest | 494 ₹3,952 |
| 7.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 22 | Sqm | 266 ₹5,852 | 120 ₹2,640 Lowest | 229 ₹5,038 |
| 8.00 | Plain Cement Concrete M7.5 (1:4:8) mix Using 40mm ISS HBG metal including all cost conveyance of materials and labour charges etc. complete as per standard specification | 4 | cum | 5,997 ₹23,988 | 4,500 ₹18,000 Lowest | 5,180 ₹20,720 |
| 9.00 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the departmental officers. | 11 | cum | 8,630 ₹94,930 | 5,000 ₹55,000 Lowest | 7,454 ₹81,994 |
| 10.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 45 | sqm | 342 ₹15,390 | 300 ₹13,500 | 295 ₹13,275 Lowest |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
18 Sept 2026, 3:00 pmClosed
Commissioner
Kundrathur Municipality
Repair and Maintenance works of Micro Compost Centre (MCC) Shed No. 1 in Kundrathur Municipality
2026_MAWS_699392_1
1425/2026/E1 dated 28.08.2026
Open Tender
Maintenance Works
Item Rate
30 days
Kundrathur
1 document required · 1 mandatory
₹0
₹12,000
28 Sept 2026
29 Aug 2026
18 Sept 2026
29 Aug 2026
18 Sept 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement | 10 | Sqm | - | - |
| 2 | Dadooing walls with Glazed tiles of sizes 300mm X 200mm X 6mm size of approved make and quality and colour Set in cement mortar 1:2 (One part of Cement and two part of Plastering Sand (P- Sand)) over 10 mm base layer plastering and pointing with white cement neatly as directed. | 51 | Sqm | - | - |
| 3 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. | 891 | Sqm | - | - |
| 4 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 604 | Sqm | - | - |
| 5 | Solid PVC Door Shutters using 19 Gauge 19mm MS squaretubes for styles and outer frames. 15mm MS square tubesfor top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using5mm thick solid PVC Sheets for panelling shall rigidly fixedin position including necessary furniture and fittings. Theover all size of styles shall be 50mm x 30mm. The over allsize of top rail, lock rail and bottom rail shall be 75mm x30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter | 7 | Sqm | - | - |
| 6 | Dismantling of Existing Plain Cement Concrete | 8 | Sqm | - | - |
| 7 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 22 | Sqm | - | - |
| 8 | Plain Cement Concrete M7.5 (1:4:8) mix Using 40mm ISS HBG metal including all cost conveyance of materials and labour charges etc. complete as per standard specification | 4 | cum | - | - |
| 9 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the departmental officers. | 11 | cum | - | - |
| 10 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 45 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_840772.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .