Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹95,178.78Admitted-Finance | -35.12% | ₹95,178.78 | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹48,572.28 (51.0%)Admitted-Finance | -2.01% | ₹1.4 L+₹48,572.28 (51.0%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹54,601.64 (57.4%)Admitted-Finance | +2.10% | ₹1.5 L+₹54,601.64 (57.4%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 L+₹58,855.93 (61.8%)Admitted-Finance | +5.00% | ₹1.5 L+₹58,855.93 (61.8%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-copy of GSTIN certificate NOT uploaded |
Tender Value
₹1.5 L
EMD Value
₹2,920
Closing Date
18 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
P/Work at Ward No 5 Mohalla Mahasha behind house of Rakesh Kumar, Dharam Chand, Vinod Kumar and others Pyt Ghaink Block Bhalwal AC Nagrota
2026_RDPR_319097_19
e-NIT No. 363 REW J of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹2,920
16 Sept 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for preparation of site to be paid as per actual | 2 | No | 553 | ₹1,106 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres | 10.51 | cum | 256.85 | ₹2,699.49 |
| 3 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 40mm nominal size) | 18.4 | cum | 5,733.6 | ₹1,05,498.24 |
| 4 | Supply and placing of stone | 4.5 | cum | 700 | ₹3,150 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 85 | sqm | 286.35 | ₹24,339.75 |
| 6 | Carriage of sand and Agg 10 Km by MT | 24.75 | cum | 279.04 | ₹6,906.24 |
| 7 | Providing and fixing of sign board of size including writing and painting all complete | 1 | No | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1055450.xls
BOQ • 0.31 MB
363.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .