| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance | ₹4.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.3 LRejected-Finance | ₹4.3 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SWETHALAKSHMI ENGINEERING L1 | M S R Construction L2 |
|---|---|---|---|---|---|
| 1.00Charges for Attending oil leakage in 250 KVA Transformer Unit HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket, Oil seal and other accessories and 250 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV, Acidity test of the transformer etc., completeas per specification as directed by the Departmental Engineers. | |||||
| 1.10 | 250 KVA Transformer | 1 | Job | 29,700 ₹29,700 | 30,000 ₹30,000 |
| 1.20Charges for removing the oil and refilling the new transformer oil to the 250 KVA Transformer Unit including transport charges and other etc. | |||||
| 1.30 | 250 KVA Transformer | 395 | Liters | 285 ₹1.1 L | 290 ₹1.1 L |
| 1.40Charges towards Repair, Replacement & Servicing of 2 Pole Structure in Transformer yard 22KV AB Switch, HG Fuse set , 22 KV Line Type LAS with earthing arrangements HT Power, 22KV HT AB Cable End Tramation Kit, Control and special Cables along with accessories Bolt, nuts & Washer, PT Insulator, Earth Pits with Earth Riser and Earth Loop Flat including cost of all at site etc., complete as per specification as directed by the Departmental Engineers. | |||||
| 1.50 | 2 Pole Structure in Transformer yard 22KV | 1 | Job | 64,800 ₹64,800 | 66,500 ₹66,500 |
| 1.60Charges towards Repair, Replacement & Servicing of soft starter panel Board transformer resistance coil complete with all electrical equipment’s for 180 HP pump for LT squirrel cage motor 160 KW including load trial run at rated voltage on grounded bed stimulating the site condition and measuring both electrical & Mechanical parameters including cost of all at site etc., complete as per specification as directed by the Departmental Engineers. | |||||
| 1.70 | 180 HP 132KW Soft Starter Penel Board | 1 | Job | 77,900 ₹77,900 | 78,500 ₹78,500 |
| 1.80Charges for Reconditioning of the Horizontal Split Casing Pump 180HP (CRI Make) Supply of SKF Bearing, Lock Nut, O Ring, Gasket, Gland Packing (Full set), Cooling Water line, Grease Nipple, Sleeve Nut(L&R) Including all other accessories, Including Material Handling Charges, Transporting and Labour Charges for Erection and Motor cum Pump set Alignment in Pump House etc., Completed | |||||
| 1.90 | 180 HP HSC Pump | 1 | Job | 17,900 ₹17,900 | 18,600 ₹18,600 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
17 Jun 2025, 3:00 pmClosed
THE COMMISSIONER
Salem City Municipal Corporation, Fort Main Road, Salem.
Attending Repair, Replacing and Servicing of 250KVA / 22KV / 433V Transformer and FCMA Soft Starter Panel 136KW and 2 Pole Structure Transformer yard 22KV AB Switch, DP LAS at Ammapet Pumping Station Dedicated Water Supply Scheme in Salem City Muni
2025_MAWS_567539_1
E2-Est No 487-WS-2024-2025
Open Tender
Civil Works
15 days
Salem city Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
17 Feb 2026
12 Jun 2025
17 Jun 2025
12 Jun 2025
17 Jun 2025
12 Jun 2025
Amount
Charges for Attending oil leakage in 250 KVA Transformer Unit HT and LT Side bushing and the dismantling bus duct top cover of transformer, draining the oil and replacing the existing gasket, Oil seal and other accessories and 250 KVA Transformer by using oil filtration unit at the site and taking a sample for top and bottom BDV, Acidity test of the transformer etc., completeas per specification as directed by the Departmental Engineers.
250 KVA Transformer
Charges for removing the oil and refilling the new transformer oil to the 250 KVA Transformer Unit including transport charges and other etc.
250 KVA Transformer
Charges towards Repair, Replacement & Servicing of 2 Pole Structure in Transformer yard 22KV AB Switch, HG Fuse set , 22 KV Line Type LAS with earthing arrangements HT Power, 22KV HT AB Cable End Tramation Kit, Control and special Cables along with accessories Bolt, nuts & Washer, PT Insulator, Earth Pits with Earth Riser and Earth Loop Flat including cost of all at site etc., complete as per specification as directed by the Departmental Engineers.
2 Pole Structure in Transformer yard 22KV
Charges towards Repair, Replacement & Servicing of soft starter panel Board transformer resistance coil complete with all electrical equipment’s for 180 HP pump for LT squirrel cage motor 160 KW including load trial run at rated voltage on grounded bed stimulating the site condition and measuring both electrical & Mechanical parameters including cost of all at site etc., complete as per specification as directed by the Departmental Engineers.
180 HP 132KW Soft Starter Penel Board
Charges for Reconditioning of the Horizontal Split Casing Pump 180HP (CRI Make) Supply of SKF Bearing, Lock Nut, O Ring, Gasket, Gland Packing (Full set), Cooling Water line, Grease Nipple, Sleeve Nut(L&R) Including all other accessories, Including Material Handling Charges, Transporting and Labour Charges for Erection and Motor cum Pump set Alignment in Pump House etc., Completed
180 HP HSC Pump
Supply and delivery L.T. cables 3.5 core 1.1 kv grade armoured aluminium conductor cross linked poly ethylene insulated pvc sheathed cables conforming to is 7098 (part i)/1988 and as amended thereafter with isi marking) (PWD SOR 2024-25 Sl.No .V - 1 , M 1557 Page No 183 )
240 Sqmm Cable 3.50Core
Jointing of LT Cables 3.5 Core 11KV Grade Armoured Aluminium Conductor Cable Conforming to IS 1554 Part I and As Amended there after with ISI Marking including Labour charges etc Complete. (TWAD SOR 2024-25 Sl.No 12.2 - I WD-M1998 Page No 125 )
240 Sqmm Cable 3.50Core
Cable Laying For laying in trenches inside the pump room or in air including Labour charges etc Complete.( TWAD SOR 2024-25 Sl.No 12.3 WD-M2018 Page No 126 )
240 to 400 sq.mm
Charges for Painting the Existing Chain link fencing with gate including the TNEB 2 poles and DP Structure including removing old paint and Applied paint dry film minimum thickness as per specification including all cost and labour ect completed.
Transformer yard 22KV
Charges towards dismantling the Submerible motor with Pump, threading out the rotor from the stator core pack, stripping out the old windings, rewinding the stator of the above motor using dual coated class `H’ polyamide imide enamelled copper wire with class `F’ style of insulation and using flexible fibre glass cable, inserting the windings, leading out the end connection, preheating, varnishing with Dr. Beck’s Isonel 31J mixed with thinner 31J, baking inoven, applying finishing varnish to the overhang portions including assembling and conducting no load trial run at rated voltage on grounded bed stimulating the site condition and measuring both electrical & Mechanical parameters including Transporation and Labour Cost etc., completed
30HP - Iyyasamy Park Tank
M S R Construction (BID ID -1369716)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid