Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | L1 | Accepted-AOC being lowest | |
| 2 | L2₹39.4 L+₹4.4 L (12.6%)Rejected-Finance A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | L2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | L3₹40.1 L+₹5.2 L (14.8%)Rejected-Finance | L3 | Rejected-Finance BEING NOT LOWEST | |
| 4 | L4₹40.7 L+₹5.8 L (16.5%)Rejected-Finance WZ 1000 NANGAL RAYA PANKHA ROAD SOUTH WEST DELHI DELHI 110046 | DELHI | SOUTH WEST DELHI | DELHI | 110046 | L4 | Rejected-Finance BEING NOT LOWEST | |
| 5 | L5₹42.1 L+₹7.1 L (20.4%)Rejected-Finance A 303 VEENA CGHS LTD PLOT NO 5D SECTOR 22 DWARKA NEW DELHI 110077 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110077 | L5 | Rejected-Finance BEING NOT LOWEST |
Tender Value
₹44.7 L
EMD Value
₹89,400
Closing Date
4 May 2023, 6:00 pmClosed
ARJUN PATRO,IDSE
GE U ELECTRIC SUPPLY,DELHI CANTT
SPL REPAIR REPLACEMENT OF LT CABLES OFFR MD ACCN AT SHANKAR VIHAR AREA, CAO POOL TO VRC, DGIS TO WARDEC AND SPL REPAIR REPLACEMENT OF 11 KV HT CABLE FROM SEKHAWATI GRID TO PARADE GROUND, SANJAY VIHAR TO CAMS SIGNAL ENCLAVE TO APS COLONY THROUGH EDP
2023_MES_588489_1
GE/ELEC/D-01/2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE U ELECTRIC SUPPLY
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE U ELECTRIC SUPPLY
₹89,400
Yes
22 May 2023
13 Apr 2023
6 May 2023
13 Apr 2023
4 May 2023
28 Apr 2023
Amount
Excavation in trenches in soft and loose soil n.exc 1.5 mtr wide and n.exc. 1.5 mtr depth for laying and taking out of old electric power cable getting out all as specified and directed by engineer –in-charge.
Supplying, laying, jointing testing and connecting in replacement of LT XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cable (heavy duty) of size 300 sqmm x 3.5 core with multistranded aluminum conductors, 1.1 KV grade, IS 7098 marked, laid in trenches, jointing & testing complete all as specified. Details as below (shankar vihar P-51 to P-48=100 RM, P-41 to P-52=105 RM,P-20 to P-29=140 RM,P-40 to P-30 =145 RM, P-8 to P-19=110 RM )Total=600 RM
All as per srl item No 2 here-in-before but size of 3.5 core, 400 sqmm complete all as specified and as directed. Details as below (VRC- I to CAO POOL-350 RM , DGIS to Wardec -250 RM)=600 RM
Material & labour for river washed and screened dry sand for filling under and above the under ground cable for cushioning of cables etc.complete all as specified and directed by engr –in-charge, Note : Measurement shall be taken after punning down.
Supply and laying unreinforced precast concrete cable covers class LV Type -1 size 250 x 150 x 40 mm. complete all as specified and directed
Returning filling in including spreading leveling watering and well ramming in layers not exceeding 25 cm thick all as specified and directed.
Removing excavated material not exceeding 50 mtr away and depositing where directed at a level n. exc 1.5 mtr above the starting point .
Material and labour in replacement for GI pipe light grade laid in trenches for cable protection of size 80 mm dia. complete all as specified and directed
Supplying, laying, jointing testing and connecting in replacement of XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cable (heavy duty) of size 300 sqmm x 3 core with multistranded aluminum conductors, 11 KV grade, IS 7098 marked, laid in trenches, jointing & testing complete all as specified.
Note :- (a) Excavation earth work sand cushioning brick protection, pipe shall be measured and paid saperately. (i) Each cable drum not less than 500 Mtr length (ii) The contractor will be responsible for taking permission from appropriate authority i.e. NHAI / IGL / Cantt board or other Units , if needed for the above said cable work necessary payments for work clearence / deposit charges for appropriate authority to be incuded in the rate quoted above (iii) Manual Excavation has be carried out at the places of Services such as of near Existing HT/LT Cables, OFC/ Telecom Cables , Water / Gas Pipe/ Sewage Pipe Lines, Area Drinages and Contractor shall be responsible for rectification of damages immediately on priority to the damages of Services occured during exection of the cable / earth work.
Supply and laying unreinforced precast concrete cable covers class HV Type -1 with peak size 300 x 180 x 40 mm. complete all as specified and directed
M&L for Boring of holes under road, pavement, hard standing by trenchless technology using ultra sounding technique and necessary machine including HDPE pipe of 150 mm dia suitable for 0.4 mpa working pressure. Note: (i) The contractor will be responsible for taking permission from appropriate authority i.e. NHAI / IGL or other Units , if needed, for above said work. (ii) Depth of Trench Less shall not less than 2 mtr from ground level unless other wise specifed due to site requirement and contractor has to maintain the depth of trenchless up to 4 mts from ground level if required as per site conditions all rates quoted shall be demeed to be included to maintain the Trench less depts as directed during exection to avoid damages to the existing services (iii) The cost quoted is deemed to be inculded for repiars / rectification for damages done to the existing elecrtical / comminication and water supply system / Sewage System during execution of work (iv) No extra cost to be paid for passing of HDPE pipe.
Supply and fix in replacement jointing kit of 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 300 Sqmm
NOTE :-(i)contractor should provide 50 % of the material as listed above within 15 days of the placing of work order and shall be verified by the Eng-in-charge.
M/s Adhikari construction co.
Rajindera Enterprises
mayur enterprises
Ridhi engineers and builders
DS CONSTRUCTION
UNITED ENGINEERING CORPORATION
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .