| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.6 L+₹1,579.13 (0.15%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹10.7 L+₹3,098.68 (0.29%)Rejected-Finance PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | EASTERN INDIA SALES AND SERVICE L2 | B T PROJECTS PRIVATE LIMITED L1 | Tarun Kumar Bhattacharya L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply delivery at site and storage of 50 MM DIA PVC Hose for dewatering | 50 | Ft | 32 ₹1,600 | 31 ₹1,550 Lowest | 33 ₹1,650 |
| 2.00 | Supply and delivery at site and storage of 25mm dia braided PVC Hose | 25 | Ft | 22 ₹550 | 21 ₹525 Lowest | 23 ₹575 |
| 3.00 | Supply delivery and fitting fixing of Thermal Overload relay after withdrawal of the faulty one from the Actuator for PUMP NO 1 ,Delivery End, at Clear water Pump house all complete with dismantling of the Actuator, servicing, testing commissioning to the entire satisfaction of the EIC, (RELAY-GE POWER RT1K 002.5-4 AMPS) | 1 | No. | 7,700 ₹7,700 | 7,600 ₹7,600 Lowest | 7,750 ₹7,750 |
| 4.00 | Deputing skilled technicians to test the Motor 250KW,Machine No NADZD1160,4Pole TEFC Induction Motor for Pump No. 2, DE-Termination, Mager test, withdrawal of the Motor from Pump base after decoupling and placing the same at operational floor all complete as per direction of the EIC | 1 | Item | 12,350 ₹12,350 | 12,300 ₹12,300 Lowest | 12,400 ₹12,400 |
| 5.00 | Carrying the Motor to kolkata works for repair includes deputing of loaders to facilitate the Motor make way out from human door owing to blockage at Main equipment entry for augmentation work in progress, includes handling, forwarding, loading by hiring tools tackles and Providing hydra Derrick arrangement ,freight to and fro after repairing all complete upto the entire satisfaction of the EIC | 2 | Item | 25,725 ₹51,450 | 25,700 ₹51,400 Lowest | 25,750 ₹51,500 |
| 6.00 | Dismantelling of the Motor 250 kw at works after testing,the Rotor and Stator seperated, work includes winding by supplying graded copper wire as per sample class-F insulation, nomex paper,DR BECK Varnish,JEL CORT,DR BECK Thinner,Glass Tape,Glass Tube,Glass Wedges,Hot Spot found in Stator Core –repaired by re-staggerring, repairing the rotor grease cap bearing guard, repairing the bearing journal after metalizing and machining, repairing the driving end housing includes metalizing and machining, stator body core press out ex-press by hydraulic, Dynamic balancing fitted with cooling fan and trueness checking of the ROTOR, Heat varnishing with DR BECK F-50 Varnish, Red BECKTOL in controlled Heat Chamber, Scrap copper value adjusted, replacement of damaged Bearings, terminal block, Nuts Bolts Washers(SS), 6 nos leads, overhauling assembly testing and fitting with painting. | 1 | Item | 4,01,100 ₹4,01,100 | 4,01,000 ₹4,01,000 Lowest | 4,01,200 ₹4,01,200 |
| 7.00Supply and delivery of bearings for aforesaid Motor 250 kw Pump NO 1 | ||||||
| 7.01 | 6322 C3 (FAG) | 1 | No. | 39,950 ₹39,950 | 39,900 ₹39,900 Lowest | 40,000 ₹40,000 |
| 7.02 | NU322EXLM1PC3 (FAG) | 1 | No. | 33,100 ₹33,100 | 33,000 ₹33,000 Lowest | 33,150 ₹33,150 |
| 7.03 | Installation of the Motor to Pump No 2 of the CW ,Termination, Coupling, Levelling, Alignment, Testing & Commissioning to the entire satisfaction of the EIC. | 1 | No. | 15,425 ₹15,425 | 15,400 ₹15,400 Lowest | 15,450 ₹15,450 |
Tender Value
Refer Docs
EMD Value
₹21,316
Closing Date
28 Dec 2024, 1:00 pmClosed
Assistant Engineer-I ED PHED
P16IndiaExchangePlaceCITAnnexeBldgExtn2ndfloorKol73
Electro mechanical works
2024_PHED_786040_14
WBPHED / AE-I / ED/ 03 / 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
21 days
Office of the Assistant Engineer-I ED PHED
Please refer Tender documents.
5 documents required · 5 mandatory
₹21,316
17 Jul 2026
17 Dec 2024
30 Dec 2024
17 Dec 2024
28 Dec 2024
17 Dec 2024
Amount
Supply delivery at site and storage of 50 MM DIA PVC Hose for dewatering
Supply and delivery at site and storage of 25mm dia braided PVC Hose
Supply delivery and fitting fixing of Thermal Overload relay after withdrawal of the faulty one from the Actuator for PUMP NO 1 ,Delivery End, at Clear water Pump house all complete with dismantling of the Actuator, servicing, testing commissioning to the entire satisfaction of the EIC, (RELAY-GE POWER RT1K 002.5-4 AMPS)
Deputing skilled technicians to test the Motor 250KW,Machine No NADZD1160,4Pole TEFC Induction Motor for Pump No. 2, DE-Termination, Mager test, withdrawal of the Motor from Pump base after decoupling and placing the same at operational floor all complete as per direction of the EIC
Carrying the Motor to kolkata works for repair includes deputing of loaders to facilitate the Motor make way out from human door owing to blockage at Main equipment entry for augmentation work in progress, includes handling, forwarding, loading by hiring tools tackles and Providing hydra Derrick arrangement ,freight to and fro after repairing all complete upto the entire satisfaction of the EIC
Dismantelling of the Motor 250 kw at works after testing,the Rotor and Stator seperated, work includes winding by supplying graded copper wire as per sample class-F insulation, nomex paper,DR BECK Varnish,JEL CORT,DR BECK Thinner,Glass Tape,Glass Tube,Glass Wedges,Hot Spot found in Stator Core –repaired by re-staggerring, repairing the rotor grease cap bearing guard, repairing the bearing journal after metalizing and machining, repairing the driving end housing includes metalizing and machining, stator body core press out ex-press by hydraulic, Dynamic balancing fitted with cooling fan and trueness checking of the ROTOR, Heat varnishing with DR BECK F-50 Varnish, Red BECKTOL in controlled Heat Chamber, Scrap copper value adjusted, replacement of damaged Bearings, terminal block, Nuts Bolts Washers(SS), 6 nos leads, overhauling assembly testing and fitting with painting.
Supply and delivery of bearings for aforesaid Motor 250 kw Pump NO 1
NU322EXLM1PC3 (FAG)
Installation of the Motor to Pump No 2 of the CW ,Termination, Coupling, Levelling, Alignment, Testing & Commissioning to the entire satisfaction of the EIC.
Supply delivery at site and storage for neutral leakage protection for 3pole 3200amp ACB FOR TRANSFORMER NO 2 IN PDB AT SUB-STATION ,installation complete with fabrication after supply of AL BUS BAR 120MMX12MM,LINKS,cutting ,bolting, fitting and fixing of Contactor and CT, nuts bolts and washers, sleeving, lugs, tapes, testing commissioning to the entire satisfaction of the EIC
Supply and delivery at site 2NO+2NC 240 V 400A Contactor (Make: L&T, Model- MNX 400 Cat no: CS94144) for above work.
Supply and delivery at site CT 3200/5A Tape Wound,CLASS-1,VA-15,ID-150MM
Repairing of the Butterfly Valve DN-350 OF CW for Pump No 2 and Pump No. 3 work includes withdrawal of the ACTUATOR and the Valve from the delivery pipe line one after the other, blank flange, dismantle of the butterfly valve and replacing the newly supplied gear box model AT301 and Rubber Disc Seal Ring, Nuts Bolts Washers and Gaskets replacements, tools and tackles with Derrick arrangements, fitting fixing, overhauling, assembly, installation, Limit setting after servicing the Actuators, oil filling SERVO-40 4Ltrs each,. testing, commissioning to the entire satisfaction of the EIC
Supply delivery at site gear Box for above Valve AT301 for DN-350 BFV Actuator operated.
Supply delivery at site Rubber Disc Seal Ring for DN-350 BFV Valve PN-1.6
Supply & delivery at site 250 Amps MCCB 3P TM SENTRON 3VA,3VA12254EE320AA0,SIEMENS Make, for Raw Water ATS Pump No. 3, Work includes withdraw of the faulty and installation of the newly supplied testing commissioning along Rotary Handle 3VA92570FK51 for the MCCB and Spreader Link 3VA92530C50(2NOS) SIEMENS 3VA,Fabrication in ATS to fix new Model Links,AL Bus Bars, Nuts, Bolts, Washers, all complete to the entire satisfaction of the EIC.
Fitting fixing of the above supplied MCCB as per direction of the EIC.
Add: 18% GST
Add: 1% CESS
EASTERN INDIA SALES AND SERVICE (BID ID -5920292)
Tarun Kumar Bhattacharya (BID ID -5924947)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .