Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.1 LAccepted-AOC 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | 1 | Accepted-AOC Awarded |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
16 Apr 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/CEDC/North/CBE
Office of the Superintending Engineer/CEDC/North/Coimbatore
Central Stores
2025_EB_537472_1
SE/CEDC/N/CBE/C/No.21/2024-25
Open Tender
Civil Works
Works
90 days
Tatabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
Yes
20 May 2025
2 Apr 2025
17 Apr 2025
2 Apr 2025
16 Apr 2025
2 Apr 2025
Amount
Clearing light jungle and disposing away from site including cost of T&Ps, labour, lead, lift, etc., complete.
Earth work excavation in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification.
Supplying and filling the m.sand for foundation and basement including cost of sand, filling charges watering & consolidation with all leads, lifts as per standard specification etc., complete.
Plain cement concrete in CC 1:3:6, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Plain cement concrete in CC 1:2:4, using 20mm HBG metal for foundation including cost of all materials, labour charges, consolidation, curing, lead, lift, etc., complete (but excluding cost of reinforcement).
Plain cement concrete in CC 1:2:4, using 12-20mm HBG metal with form work for wall including cost of all materials, labour charges, curing, lead, lift, etc., complete.
Filling using gravel wherever necessary in well rammed including filling charges as per standard specification (watering & consolidation) including all leads, lifts, as per specification etc., complete.
Providing and laying, spreading and compacting graded stone aggregates using 0.396 cum of 45.00-22.40 mm, 0.528 cum of 22.40 - 2.36 mm and 0.396 cum of 2.36 mm & below size IRC metal to Wet Mix Macadam specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per specification clause 406 of MORTH
Plain cement concrete in CC 1:2:4, using 20mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification.
White washing two coats the inner and outer walls with approved quality of white cement including cost of all materials, labour, leads & lifts and as directed by Engineer at site.
Disposal of excess of surplus earth away in low lying area with a head load lead 100m including spreading, levelling, labour, leads, lift etc.., complete as per standard specification.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .