Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
6 May 2026, 6:00 pmClosed
Commissioner Municipal Corporation, Bharatpur
Municipal Corporation, Bharatpur
Construction of RCC Box Drain from Traffic Chauraha to multipurpose chauraha.
2026_DLB_553946_2
(02/2026-27) Municipal Corporation, Bharatpur
Open Tender
Civil Works
Percentage
180 days
Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Commissioner Municipal Corporation, Bharatpur
₹2.8 L
Yes
7 May 2026
25 Apr 2026
7 May 2026
25 Apr 2026
6 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Dismantling Stone MasonryRubble stone masonry in cement mortar. | 351 | CUM | 386 | ₹1,35,486 |
| 2 | Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. | 175.5 | CUM | 384.5 | ₹67,479.75 |
| 3 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 663 | Cum | 229.5 | ₹1,52,158.5 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: | 572.91 | Cum | 254.76 | ₹1,45,954.55 |
| 5 | Random rubble dry stone Kharanja (soling) under floor. | 165.75 | Cum | 2,270 | ₹3,76,252.5 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 110.5 | cum | 4,575 | ₹5,05,537.5 |
| 7 | Providing and laying structural plain/ reinforced cement concrete (design mix) of specified grade in substructure at all levels using batching plant, transit mixer, concrete pump and vibrator including cost of form work complete as per drawing and clause 1500, 1700 and 2200 of MoRT&H specification including all scaffolding, material, labour, machinery etc. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.RCC Grade M -30 | 729.3 | cum | 6,620 | ₹48,27,966 |
| 8 | Extra for laying reinforced cement concrete in or under water and/ or liquid mud including cost of pumping or bailing out water and removing slush etc., complete. | 202.3 | cum | 720 | ₹1,45,656 |
| 9.1 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 260 | sqm | 236.5 | ₹61,490 |
| 9.2 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 2,600 | sqm | 367 | ₹9,54,200 |
stage.html
html • 0.02 MB
finance_987260.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_987260.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .