Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹8.1 L+₹15,822 (1.99%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹8.9 L+₹95,696.08 (12.1%)Accepted-Finance 21 BUS STAND ROAD PALI PALI PALI RAJASTHAN 306401 | PALI | RAJASTHAN | 306401 | 3 | Accepted-Finance L3 | |
| 4 | 4₹9.9 L+₹1.9 L (24.5%)Accepted-Finance | 4 | Accepted-Finance L4 |
Tender Value
₹11.4 L
EMD Value
₹22,810
Closing Date
20 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PRI Lucknow Mayabunder
Office of the Executive Engineer PRI Mayabunder
Renovation of Footpath from road side to RC Church at Rampur under Panchayat Samiti, Mayabunder.
2023_RDPRI_11491_1
48/EE/PRI/MB/23-2024
Open Tender
Civil Works - Roads
Works
90 days
Rampur
Refer Tender Document
5 documents required · 5 mandatory
₹500
Yes
Executive Engineer PRI N and MAD Mayabunder
₹22,810
Yes
22 Sept 2023
8 Sept 2023
20 Sept 2023
8 Sept 2023
20 Sept 2023
8 Sept 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 Pulverised sand (zone-III) derived from natura sources : 6 graded stone aggregate 40 mm nominal size derived from natura sources)
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc. for mass concrete
12 mm Cement Plaster of mix:
1:4 (1 Cement :4 River Sand)
Extra for making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc.
BHAGWAN SINGH
M/s Sharma Trading Company
S B SHARMA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .