Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 CrAdmitted-Finance | -38.96% | ₹6.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.8 Cr+₹27.9 L (4.26%)Admitted-Finance | -36.36% | ₹6.8 Cr+₹27.9 L (4.26%) | L2 | Admitted-Finance |
| 3 | L3₹7.1 Cr+₹59.3 L (9.04%)Admitted-Finance | -33.44% | ₹7.1 Cr+₹59.3 L (9.04%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 Cr+₹64.0 L (9.76%)Admitted-Finance | -33.00% | ₹7.2 Cr+₹64.0 L (9.76%) | L4 | Admitted-Finance |
| 5 | L5₹7.2 Cr+₹68.4 L (10.4%)Admitted-Finance | -32.59% | ₹7.2 Cr+₹68.4 L (10.4%) | L5 | Admitted-Finance |
Tender Value
₹10.7 Cr
EMD Value
₹21.5 L
Closing Date
27 Aug 2026, 4:00 pmClosed
ADGP Hqrs PHQ
Srinagar
Construction
2026_DGPJK_320486_1
e-NIT/EE-PCD/PHQ/63/2026-27
Open Tender
Civil Works
Percentage
365 days
STC Talwara Reasi
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,000
Exen PCD PHQ
₹21.5 L
PCD PHQ Srinagar
19 Sept 2026
13 Aug 2026
28 Aug 2026
13 Aug 2026
27 Aug 2026
20 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | 602.32 | Cum | 187.3 | ₹1,12,814.54 |
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by EIC Ordinary Rock | 75.29 | Cum | 392.8 | ₹29,573.91 |
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock (Blasting Prohibited) | 75.29 | Cum | 1,128.75 | ₹84,983.59 |
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil. | 1,303.8 | Cum | 256.85 | ₹3,34,881.03 |
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres Ordinary Rock | 162.98 | Cum | 493.5 | ₹80,430.63 |
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres Hard Rock (Blasting prohibited ) | 162.98 | Cum | 1,196.05 | ₹1,94,932.23 |
| - | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material All kinds of soil | 36.88 | Cum | 89.75 | ₹3,309.98 |
| - | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material Ordinary or hard rock | 15.8 | Cum | 161 | ₹2,543.8 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 25 meter beyond 1 m from cutting edge All kinds of soil | 57.6 | Cum | 576.45 | ₹33,203.52 |
| - | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge All kinds of soil | 700 | Sqm | 91.75 | ₹64,225 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.80 MB
Tendernotice_2.pdf
PDF • 16.87 MB
BOQ_1065660.xls
BOQ • 1.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .