| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 CrAccepted-Finance | ₹1.7 Cr | 1 | Accepted-Finance l1 |
| 2 | 2₹1.8 Cr+₹13.8 L (8.09%)Rejected-Finance 144 A THOTTIPALAYAM MUTHUR ERODE 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹1.8 Cr+₹13.8 L (8.09%) | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRI GANESH LAKSHMI CONSTRUCTIONS INDIA PRIVATE LIMITED L1 | DIVYA DARSHANI AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Milling the existing BT Surface 5 to 7cm depth charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc., complete as per direction of the departmental officers. | 13,259 | 1m2 (One Square metre) | 86.6 ₹11,48,229.4 Lowest | 100 ₹13,25,900 |
| 2.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 74 | 1m3 (One Cubic metre) | 4,809 ₹3,55,866 Lowest | 5,000 ₹3,70,000 |
| 3.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 14,732 | 1m2 (One Square metre) | 28.9 ₹4,25,754.8 Lowest | 30 ₹4,41,960 |
| 4.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 737 | 1m3 (One Cubic metre) | 10,422 ₹76,81,014 Lowest | 11,000 ₹81,07,000 |
| 5.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 442 | 1m3 (One Cubic metre) | 10,987.5 ₹48,56,475 Lowest | 12,200 ₹53,92,400 |
| 6.00 | GST 18% | 1 | No | 26,04,121.06 ₹26,04,121.06 Lowest | 28,14,706.8 ₹28,14,706.8 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
28 Jan 2026, 3:00 pmClosed
COMMISSIONER KANGEYAM MUNICIPALITY
KANGEYAM MUNICIPALITY
Restoration of BT Surface at W.No.13 Periyar Nagar 1st Main Street (158013R184), Periyar Nagar 2nd Main Street (158013R185), Periyar Nagar 3rd Main Street (158013R186), Anna Nagar 1st Main Street (158013R208), W.No.14 Bunglowpudhur Road (158014R367),
2026_MAWS_642996_1
1255-1(d)/2025/E1
Open Tender
Civil Works - Roads
Works
120 days
KANGEYAM MUNICIPAL AREAS
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.7 L
KANGEYAM MUNICIPALITY
5 Feb 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
14 Jan 2026
Milling the existing BT Surface 5 to 7cm depth charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc., complete as per direction of the departmental officers.
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.79 MB
BOQ_770440.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .