Loading…
Loading…
Tender Value
₹17.1 L
EMD Value
₹17,100
Closing Date
15 Oct 2026, 3:30 pm
Block Developement Officer(BP)
Panchayat Union Office, Uthamapalayam
Construction of New Anganwadi building at Kaliamman Kovil street at T.Meeantchipuram Panchayat.
2026_RDTN_707241_1
0702/2026/A5 Date 22.09.2026
Open Tender
Civil Works - Others
Item Rate
Uthamapalayam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,100
Yes
23 Sept 2026
23 Sept 2026
15 Oct 2026
23 Sept 2026
15 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of New Anganwadi building at Kaliamman Kovil street at T.Meeantchipuram Panchayat. | |||||
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 29.66 | cum | - | - |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 10.34 | cum | - | - |
| 1.03 | Supply and Filling with Red gravel including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete | 15.25 | cum | - | - |
| 1.04 | Supply and Filling with M.Sand including all labour charges for filling including watering ramming, consolidation and other incidental charges etc., complete | 10.21 | cum | - | - |
| 1.05 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 30.72 | cum | - | - |
| 1.06 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 21.28 | cum | - | - |
| 1.07 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 2,850 | kg | - | - |
| 1.08 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam,sunshade etc complete., | 68.38 | sqm | - | - |
| 1.09 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(for column ,E.beam,plinth,beam) | 86.92 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_850024.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .