Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
5 Dec 2025, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
60 days
Expenditure
General
30
3 conditions
Order will be placed on the manufacturer or its authorized agent having proven performance. The manufacturer firm must have satisfactorily executed order of Zonal Railways/ PUS/CORE, other Govt. ,Semi Govt. organization for the tendered/similar item against purchase order placed during three preceding completed financial year and current year up to date of tender opening.
Manufacturers or their authorized Distributor/ Dealer/Agent with Tenders specific authorization can only quote. OEMs can authorize and give Tender Specific Authorization to its Agent / dealers to quote on their behalf provided the manufacturer takes full responsibility for the quality of the material including warranty obligation and the inspection of product against Railways order is carried out at the manufacturers premises. The offer without Tender Specific Authorisation Letter will be summarily rejected if tenderer is not manufacturer/OEM
The OEM authorization letter to be attached along with offer for after sales service duly confirming that they will stand guarantee / warranty for period of 2 years after the supply or else offer will not be considered
36 conditions
HAVE YOU SUBMITTED BANKER DETAILS VIZ. NAME OF BANK AND COMPLETE ADDRESS WITH PIN CODE, BANK A/C NUMBER, TYPE OF A/C, BRANCH CODE NO., BENIFICIARY NAME AND ADDRESS,IFSC CODE, RTGS CODE ETC. ALONGWITH GST REGISTRATION CERTIFICATE, IT IS ESSENTIAL TO SUBMIT THE BANKS DETAILS FOR RELEASING OF PAYMENTS.
Have you quoted Warranty Obligations as per requirement
Have you quoted Delivery Period correctly and precisely ?
Bankers Report, Financial Statements etc
Have you quoted price of basic machine, Concomitant Accessories, essential spares, essential services, AMC and other items as per the requirement. It is mandatory to submit offers against all these items otherwise the bid shall not be considered in ranking
FOR: Destination.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions
80% payment shall be made on receipt of the items in satisfactory condition, against suppliers challan certified by consignee gazetted officer, and inspection certificate issued by the nominated inspection agency. Balance 20% payment shall be made after successful installation, commissioning and acceptance of the equipment by consignee subject to submission of Bank Guarantee for 10% of the contract value for warranty obligations, valid beyond 6 months period of warranty.
1) Offered model, product brochure/literature to be uploaded for evaluation. 2) Compliance to technical specification for each of enclosed specification parameters should be uploaded or else the offer will be rejected. 3) In case of any deviation to specification like in terms of dimension, capacity, size and etc it should be clearly indicated in the offer. 4) In case of any deviation to warranty, should be clearly indicated in the offer. 5) Railway reserves the right either to consider or not to consider offered deviations based on end user requirement.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 location across Assam · 2 Numbers total
Supply Installation, Testing and Commissioning of Complete H.O.G
30255112~NFR
30255112
Limited - Indigenous
Goods
Assam
₹0
Exempted
5 Dec 2025
3 Dec 2025
1 item · 2 Numbers total
Supply Installation, Testing and Commissioning of Complete HOG Circuit test bench comprisi ng of equipment's as per Specification make :-BCH, SIEMENS, C&S or ABB. [ Warranty Period: 12 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/C/IC/GHY, NFR | Assam | 2.00 Numbers |
| Total | 2 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5305129.pdf
ATTACHMENT
5503876.pdf
ATTACHMENT
5503874.pdf
ATTACHMENT
5305131.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .