| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.5 LAccepted-AOC | ₹55.5 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹57.2 LRejected-Finance | ₹57.2 L | L2 | Rejected-Finance L2 Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical 6 18 KADAIYATHUPATTI CHIDAMBARAVIDUTHI POST ARANTHANGI PUDUKKOTTAI DISTRICT 614 622 | PUDUKKOTTAI | TAMIL NADU | 614622 | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw the Contractor |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Withdraw the Contractor |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
| Sl No | Description | Qty | Unit | MANIKANDIAR MOORTHY L1 | N MUTHUVEL L2 |
|---|---|---|---|---|---|
| 1.00Renewal Black Topping the road from Manippallam road to Alangudi road (via) Nemmakkottai Km 0/0 - 2/9 in Pudukkottaividuthi Panchayat | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 2,088 | Sqm | 6.3 ₹13,154.4 Lowest | 6.55 ₹13,676.4 |
| 3.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 1,305 | Cum | 140 ₹1,82,700 Lowest | 144.66 ₹1,88,781.3 |
| 4.00Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501. | |||||
| 5.00 | Km 0/0 - 1/0 | 7.04 | Cum | 4,367 ₹30,743.68 Lowest | 4,498.99 ₹31,672.89 |
| 6.00 | Km 1/0 - 2/0 | 7.95 | Cum | 4,376 ₹34,789.2 Lowest | 4,507.92 ₹35,837.96 |
| 7.00 | Km 2/0 - 2/9 | 5.02 | Cum | 4,385 ₹22,012.7 Lowest | 4,516.85 ₹22,674.59 |
| 8.00Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501. | |||||
| 9.00 | Km 0/0 - 1/0 | 4.32 | Cum | 5,050 ₹21,816 Lowest | 5,202.48 ₹22,474.71 |
| 10.00 | Km 1/0 - 2/0 | 4.51 | Sqm | 5,059 ₹22,816.09 Lowest | 5,211.41 ₹23,503.46 |
Tender Value
₹56.6 L
EMD Value
₹56,600
Closing Date
17 Feb 2026, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.Uniion Office,Thiruvarankulam
Renewal Black Topping the road from Manippallam road to Alangudi road (via) Nemmakkottai Km 0/0 - 2/9 in Pudukkottaividuthi Panchayat
2026_RDTN_653320_1
Tvk/RRMS/Work-1
Open Tender
Civil Works
Item Rate
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹56,600
16 Jul 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Renewal Black Topping the road from Manippallam road to Alangudi road (via) Nemmakkottai Km 0/0 - 2/9 in Pudukkottaividuthi Panchayat | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 2,088 | Sqm | - | - |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 1,305 | Cum | - | - |
| 4 | Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501. | - | - | - | - |
| 5 | Km 0/0 - 1/0 | 7.04 | Cum | - | - |
| 6 | Km 1/0 - 2/0 | 7.95 | Cum | - | - |
| 7 | Km 2/0 - 2/9 | 5.02 | Cum | - | - |
| 8 | Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501. | - | - | - | - |
| 9 | Km 0/0 - 1/0 | 4.32 | Cum | - | - |
| 10 | Km 1/0 - 2/0 | 4.51 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.40 MB
NemmakkottaiTenderDocument.pdf
Tender Documents • 0.92 MB
BOQ_783407.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].