Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.8 LAdmitted-Finance KAUSALY KUNJ KORHAR ANANDPUR CAMP BIHTA PATNA 801103 | BIHTA | PATNA | BIHAR | 801103 | -0.10% | ₹16.8 L | L1 | Admitted-Finance |
| 2 | L2₹16.9 LAdmitted-Finance 52 H NEW COLONY ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | -0.01% | ₹16.9 L | L2 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
15 Apr 2026, 12:00 pmClosed
EE RED ,Vikas Bhawan, Sultanpur
EE RED ,Vikas Bhawan, Sultanpur
Under District Sultanpur, Construction of Advocates Chamber in Tehsil Premises under Block Jaisinghpur, Lot No 1
2026_REDUP_1134821_1
3051/EE RED Sultanpur/25-26 Dt 07/03/2026
Open Tender
Civil Works
120 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹40,000
EE RED ,Vikas Bhawan, Sultanpur
7 May 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Excavation in foundations in ordinary soil i/c 1.5mtr lift and lead upto 30mtr and i/c filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into plinth and removeland disposel of surplus earth as directed by the engineer incharge upto a distance of 30mtr from the foundation trenches asper SI no.251 | - | Cum | - | - | |
Cement concreat in foundation and base with 1:4:8 in cement, C-sand and 40mm Nominal size Stone ballast i/c supply of the material labour T&P etc. as per SI no. 281 | 1 | Cum | - | - | |
M-150 B/W with 1:6 cement and F-sand morter in Foundation i/c all labaur material t&P as si no 303 | 1 | Cum | - | - | |
E/w in cutting in embankment in soil i/c a cortage of 3 km distance including all complete of work.acs per SI no.253 | - | Cum | - | - | |
R.C.C.work in footings with cement, c-sand and 20mm grit in proportion of 1:1.5:3 excluding supply of reinforcement i/c all labour material T&P as per SI no.284(b) | 1 | Cum | - | - | |
R.C.C.work in Slab with cement, c-sand and 20mm grit in proportion of 1:1.5:3 excluding supply of reinforcement i/c all labaur material T&P as per SI no.284(b) | - | Cum | - | - | |
Centering and Shuttering i/c strutting, propping etc. and removal of form work for Foundation, Columns, Slab etc. | - | Sqm | - | - | |
Mild steel or iron in plane work such as reinforced concrete or reinforced brick brick work(when not includede inoverall rates) wrought to required shape as necessery including bending for proper completion ofthe work and including supply of steel its wastage bend hooks and authorzed overlaping shalll be measured up to floor two levelas per SI no 504 | 1 | Kg. | - | - | |
M-15 B/W with 1:6 cement and c-sand morter in super structure for one brick thickness i/c all labaur material t&P. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
Sultanpur_SBD.pdf
Tender Documents • 3.74 MB
BOQ_2118538.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid