| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹45,628.80 (0.44%)Admitted-Finance | ₹1.0 Cr+₹45,628.80 (0.44%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GSK Constructions L2 | sivakumar s L1 |
|---|---|---|---|---|---|
| 1.00IMPROVEMENTS TO THE ROAD FROM SOUTH ALATHUR - GOODANAGARAM ANANGANALLOE TO CHITHATHUR (VIA) OLAKASI ROAD.KM 0/000-2/600. | |||||
| 2.00 | Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201 | 4,680 | sqm | 9 ₹42,120 | 7.1 ₹33,228 Lowest |
| 3.00 | Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4 | 3,072.5 | sqm | 20 ₹61,450 | 12.3 ₹37,791.75 Lowest |
| 4.00Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3. | |||||
| 5.00 | km 0/000 -1/000 | 1,073.86 | cum | 48 ₹51,545.28 | 45.37 ₹48,721.03 Lowest |
| 6.00 | km 1/000-2/000 | 1,251.46 | cum | 45.37 ₹56,778.74 Lowest | 45.37 ₹56,778.74 Lowest |
| 7.00 | km 2/000-2/290 | 639.63 | cum | 45.37 ₹29,020.01 Lowest | 45.37 ₹29,020.01 Lowest |
| 8.00Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth ) | |||||
| 9.00 | km 0/000 -1/000 | 1,073.86 | cum | 67.51 ₹72,496.29 Lowest | 67.51 ₹72,496.29 Lowest |
| 10.00 | km 1/000-2/000 | 1,251.46 | cum | 67.81 ₹84,861.5 Lowest | 67.81 ₹84,861.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
15 Feb 2021, 3:00 pmClosed
THE PROJECT DIRECTOR
THE PROJECT DIRECTOR, DRDA, Vellore
Vellore DISTRICT IMPROVEMENTS TO THE ROAD FROM SOUTH ALATHUR - GOODANAGARAM ANANGANALLOE TO CHITHATHUR VIA OLAKASI ROAD. in Gudiyatham block Package no 26-159 PMGSY III BATCH I/2020-21 Retender /2020-21
2021_RDTN_106185_1
TN-26 159 Gudiyatham
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.3 L
DRDA, Vellore
24 Feb 2021
30 Jan 2021
15 Feb 2021
30 Jan 2021
15 Feb 2021
30 Jan 2021
5 Feb 2021
Amount
IMPROVEMENTS TO THE ROAD FROM SOUTH ALATHUR - GOODANAGARAM ANANGANALLOE TO CHITHATHUR (VIA) OLAKASI ROAD.KM 0/000-2/600.
Clearing and grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201
Scarifying the existing bituminous road surface to depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as pwr technical specification clause 301.4
Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification Clause 302.3.
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Filling with cut Earth )
Construction of embankment with approval Materials deposited at site from road way cutting and excavation from drain and foundation of other structures graded and compacted to meat requirement of tables 300.1 and 300.2 asper technical specification clause 301.5 (Gravel Shoulder)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Primer Coat with bitumen emulsion (SS –I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/ sqm using mechanical means as per Technical Specification Clause 502.
Providing and Laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 Premixed with bituminous binder, transported to site up to lead o 1000m laid over a previously prepared surface with Paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause 504.
Providing, laying and rolling of Open Graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a 3 wheel 80-100KN static roller capacity, finished to required level and grades, to be followed by seal coat of Type-A as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A as per Technical Specification Clause 510.
providing and fixing of Retro reflectorised cautionary ,mandatory signs,with defination plate made out of high intensity grade prismatic sheeting conforming to IRC -67:2010 & ASTM D 4956-09 , Types IV specification and fixing over 1.5 mm thick aluminium sheet fixed on back support frame of 25 mm x25mmx3 mm mild steel angle and supported on the mild steel angle iron 75 mm x75 mm x 6mm firmly fixed to the ground by means properly designed foundation with M 15 grade cement concrete 45 cm x45 cm x60 cm below ground level ect complete including 7 years warranty for the retro reflective sheeting as per clause 6.9 of IRC 67-2010 specification ( as per MORT & spec. no 801)
providing and fixing name board
providing and fixing Sign board
providing and fixing logo of PMGSY project
providing and fixing citizen information board of PMGSY project
providing and fixing maintainance information board of PMGSY project
Kilometer Stone Reinforced Cement Concrete M15 grade kilometer stone /local stone of standard design as per IRC:8 fixing in position including painting and printing, etc., as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast)
(ii) 200m Stone (pre-cast)(HM stone)
CONSTRUCTION OF PROTECTIVE WORK (VIDE SUB ESTIMATES ENCLOSED)
Earth work excavation for foundation of structures up to 3 m depth as per drawing and Technical Specification Clause 1104 including setting out, construction of sharing and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and back filling in trenches with approved material.
Supply and filling foundation basement with filling sand in layers not more than 15 cm thick well ramed wated and compacted complete complying with standrad specifications.
Cement concrete 1:2.5:5 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(Below sill)
Cement concrete 1:2:4 mix using HBG metal for Foundation including watering wherever necessary and laid in layers not more than 15 cm thick.,compacting etc., complete complying with standrad specificationsand as directed.(Above sill)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wint wall, return wall with 100 mm dia AC pipes extending throught the full width of the structues with slope of 1 (V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709,1204.3.7
Filter media Behind abutment,wing wall and Return wall complete as per Drawing and Technical specification.
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GSK Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .