Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.1 LAdmitted-Finance | -31.00% | ₹24.1 L | L1 | Admitted-Finance |
| 2 | L2₹25.1 LAdmitted-Finance | -28.11% | ₹25.1 L | L2 | Admitted-Finance |
| 3 | L3₹31.5 LAdmitted-Finance | -9.71% | ₹31.5 L | L3 | Admitted-Finance |
| 4 | L4₹32.7 LAdmitted-Finance | -6.21% | ₹32.7 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
₹34.9 L
EMD Value
₹69,760
Closing Date
18 May 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
RSAMB DIV UDAIPUR
Remaining Cutting work of Construction of Working Women Hostel (50 Bedded) Capacity) at VasundhraVihar Dungarpur
2026_RSAMB_555706_21
RSAMB/UDAIPUR/NIB-02/2026-27
Open Tender
Civil Works
120 days
DUNGARPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
EE, RSAMB
₹69,760
Yes
22 May 2026
2 May 2026
20 May 2026
2 May 2026
18 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 3,393 | P.cum | 31 | ₹1,05,183 | 1596548965 | |
Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRTH Specification Clause 301.3.5 | 7,998 | P.cum | 44 | ₹3,51,912 | - | |
Excavation in Hard Rock (blasting prohibited) .Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per MoRTH Specification Clause 301.3.5,Mechanical Means | 12,845 | P.cum | 236 | ₹30,31,420 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 1.19 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.90 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.26 MB
Tendernotice_7.pdf
PDF • 1.25 MB
Tendernotice_8.pdf
PDF • 0.26 MB
Tendernotice_9.pdf
PDF • 0.09 MB
21.pdf
Tender Documents • 0.79 MB
BOQ_989822.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid