Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹69.5 LAccepted-AOC AKALA JAJOOPUR BASTI | BASTI | BASTI | UTTAR PRADESH | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹78.7 L+₹9.2 L (13.3%)Rejected-Finance SBI MIRZAPUR SBI MAIN BRANCH 1ST FLOOR DUNKELNGANJ MIRZAPUR 231001 | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹81.9 L+₹12.5 L (18.0%)Rejected-Finance | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S KRISHNA CONSTRUCTION L1 | S.B. ENTERPRISES L3 | MS SHREYA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | 1,462.5 | Cum. | 90 ₹1,31,625 | 86 ₹1,25,775 Lowest | 110 ₹1,60,875 |
| 2.00 | Earth work in filling in R/S slope of canal section including cost of all material, labour and T&P etc required for proper completion of work. | 15,941.26 | Cum. | 190 ₹30,28,839.4 Lowest | 216 ₹34,43,312.16 | 210 ₹33,47,664.6 |
| 3.00 | Providing and Laying coarse sand in toe filter including cost of all material, labour and T&P etc required for proper completion of work. | 140 | Cum. | 1,935 ₹2,70,900 Lowest | 2,186 ₹3,06,040 | 2,100 ₹2,94,000 |
| 4.00 | Providing and Laying graded Stone grit 4.75 to 20 mm in toe filter including cost of all material, labour and T&P etc required for proper completion of work. | 140 | Cum. | 1,714 ₹2,39,960 Lowest | 2,086 ₹2,92,040 | 1,950 ₹2,73,000 |
| 5.00 | Providing and Laying graded Stone ballast 20 to 40 mm in toe filter including cost of all material, labour and T&P etc required for proper completion of work. | 140 | Cum. | 1,368 ₹1,91,520 Lowest | 1,586 ₹2,22,040 | 1,500 ₹2,10,000 |
| 6.00 | Carriage and Laying stone(weight not less than 40 kg.) for toe filter and right bank slope of canal including cost of all material, labour and T&P etc required for proper completion of work. | 2,745 | Cum. | 1,123 ₹30,82,635 Lowest | 1,386 ₹38,04,570 | 1,305 ₹35,82,225 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
23 Jul 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Bank Strengthening work between Km. 35.550 to Km. 35.900 of B.S.F.C
2026_UPIDC_1168208_6
03/SE/2026-27
Open Tender
Civil Works
Item Rate
240 days
Sidhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.7 L
28 Sept 2026
10 Jul 2026
23 Jul 2026
10 Jul 2026
23 Jul 2026
14 Jul 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | 1,462.5 | Cum. | - | - |
| 2 | Earth work in filling in R/S slope of canal section including cost of all material, labour and T&P etc required for proper completion of work. | 15,941.26 | Cum. | - | - |
| 3 | Providing and Laying coarse sand in toe filter including cost of all material, labour and T&P etc required for proper completion of work. | 140 | Cum. | - | - |
| 4 | Providing and Laying graded Stone grit 4.75 to 20 mm in toe filter including cost of all material, labour and T&P etc required for proper completion of work. | 140 | Cum. | - | - |
| 5 | Providing and Laying graded Stone ballast 20 to 40 mm in toe filter including cost of all material, labour and T&P etc required for proper completion of work. | 140 | Cum. | - | - |
| 6 | Carriage and Laying stone(weight not less than 40 kg.) for toe filter and right bank slope of canal including cost of all material, labour and T&P etc required for proper completion of work. | 2,745 | Cum. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Lot_6.pdf
Tender Documents • 3.48 MB
BOQ_2191218.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .