Tender Value
₹2.5 L
EMD Value
₹6,250
Closing Date
12 Mar 2026, 10:00 pmClosed
Directorate of Municipal Administration
YUSUF
Shifting of electrical poles at ramnagar road for making drain at ward no 29 in Vijayapura City.
DMA/2025-26/EL/WORK_INDENT55746
DMA/2025-26/EL/WORK_INDENT55746
Open
Electrical
Electronic Documents, First(One Cover)
DMA City Corporation Vijayapura
5 documents required · 4 mandatory · 1 optional
₹500
₹6,250
4 Mar 2026
4 Mar 2026
11 Mar 2026
Shifting of electrical poles at ramnagar road for making drain at ward no 29 in Vijayapura City.
Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved
Drawing. (It.No.1.1.1 PWD Ele SR 2023-24)
Supply and fixing of RCC Pole - 9 Mtr Long, 145 Kg WL
(Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as
per IS-785 (It.No.1.01 PWD Ele SR 2023-24)
Supply and fixing of PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards (It.No.1.06 PWD Ele SR 2023-24)
Supply and fixing of PSCC Pole - 8 Mtr Long, 200 Kg WL for stud (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards (It.No.1.05 PWD Ele SR 2023-24)
Stringing of Rabbit ACSR conductor
(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM (It.No.7.02 PWD Ele SR 2023-24 as per amended rate by HESCOM)
Fixing of 11 kV, 200 Amps Single Break GOS
(Dwg No. BESCOM/GM/QS&S/23 Dtd 24.11.2018) (It.No.7.02 PWD Ele SR 2023-24)
Providing Spiral Earth Electrode (It.No.2.16 PWD Ele SR 2023-24)
Providing 11kv Horizontal cross arm with H.T Single top support, clamp, bolts, nuts and washers for PSC poles (It.No.3.01 PWD Ele SR 2023-24)
Providing 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) (It.No.6.06 PWD Ele SR 2023-24)
Providing 11 kV, 45 kN Polymeric Insulator (It.No.6.12 PWD Ele SR 2023-24)
Supplying and fixing PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards (It.No.1.05 PWD Ele SR 2023-24)
Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved
Drawing. (It.No.1.2.1 PWD Ele SR 2023-24)
Releasing and Refixing- RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- Rabbit ACSR Conductor (PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- H-frame Set for 11Kv, 200 Amps Single Break GOS Mounting - MS (PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- Double pole structure complete including 5 KG 8-swg G.I wire for structure grounding - For 9 Mtr RCC Pole 145 kg WL-(with pole) (PWD Ele SR 2023-24 1.9 times of labor cost)
Digging of Pit for providing GI Pipe type Earthing (PWD Ele SR 2023-24 item no 1.6.1)
Providing GI Pipe Earthing for lightning arrestors Transformer Neutral and Transformer Metal parts (Excluding digging of pits) (PWD Ele SR 2023-24)
Digging of Pit for GUY SET (PWD Ele SR 2023-24 item no 1.7.1)
Fixing of GUY Set with break insulator making use of 7/3.15mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) (PWD El...
8 SWG GI Wire(4.064 mm Dia), Std Wt: 131 Kg/KM (PWD Ele SR 2023-24 item no 8.02)
7/10 SWG Guy Wire(7/3.251 mm Dia), Std Wt: 680 Kg/KM (PWD Ele SR 2023-24 item no 8.01)
Releasing and Refixing- LT Protection kit (PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- 11kv 200 Amps Single Break GOS(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- Distribution Transformer-100kva Aluminium wdg.(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- LT Electronic Tri-vector meter 5A, Class-0.5 accuracy.(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- LT Wiring kit through Distribution box- for 100 kva DTC double circuit.(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- HG Fuse 11kv class solid core type.(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- LT metering box for housing the ETV meters without CTs bus bar wiring etc.(PWD Ele SR 2023-24 1.9 times of labor cost)
Releasing and Refixing- Transformer structure complete with cross arms braces, clamps, bolts, nuts and washers- for 100/250 kva- using 2 nos of 9 mtr rcc poles.(PWD Ele SR 2023-24 1.9 times of labor c...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid doc w 27 line shift indent 55743.docx
Tender Document • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .