| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC JME COLONY SHAKTINAGAR DIST SONEBHADRA UP | SHAKTINAGAR | SONEBHADRA | UTTAR PRADESH | ₹21.7 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical KHADIA BAZAR P O YOGICHAURA SHAKTINAGAR DISTT SONEBHADRA UP PIN 231222 | SHAKTINAGAR | SONEBHADRA | UP | 231222 | - | - | Rejected-Technical L3 |
Updated dates
Tender Value
₹35.0 L
EMD Value
₹43,800
Closing Date
6 Mar 2026, 11:00 amClosed
S.O.(CIVIL)
Khadia Area Dist.-Sonebhadra U.P. PIN 231222
Providing pedestals for carrying MS pipe at mid entry in mine area at Khadia Project during monsoon 2026-27
2026_NCL_353648_1
GM/KHD/C/25-26/ETN-101 Date 19/02/2026
Open Tender
Civil Works - Others
90 days
Khadia Area Dist.-Sonebhadra U.P.
REFER NIT
3 documents required · 3 mandatory
₹43,800
6 Apr 2026
19 Feb 2026
7 Mar 2026
19 Feb 2026
6 Mar 2026
20 Feb 2026
19 Feb 2026 - 23 Feb 2026
Item Description/ Heading
CIVIL PART
Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead 1.00 KM
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level : 1:1.5:3(1cement:1.5coarse sand (zone-III):3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_366453.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.78 MB
BOQ_366453.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid