Loading…
Loading…
Tender Value
₹18.5 L
EMD Value
₹36,984
Closing Date
5 Aug 2026, 5:00 pm
CMOH
CMOH OFFICE KALIMPONG
Construction of Main Gate, Boundary fencing and allied civil works at New DMO AYUSH Office, Kalimpong, GTA
2026_HFW_1034008_1
CMOH/KPG/2026/940 dt. 23-07-2026
Open Tender
CIVIL WORKS
Percentage
NEW DMO AYUSH OFFICE
Please refer Tender documents.
4 documents required · 4 mandatory
₹36,984
23 Jul 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
5 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Main Gate, Boundary fencing and allied civil works at New DMO (AYUSH) Office, Kalimpong, GTA | |||||
| 1.01 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed | 0.4 | sqm | - | - |
| 1.02 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 0.4 | sqm | - | - |
| 1.03 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.
(a) upto 150 mm. thick | 1 | cum | - | - |
| 1.04 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | - | cum | - | - |
| 1.05 | Earthwork in excavation of foundation trenches or drains in all sorts of soils including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. all complete. | - | cum | 1 | - |
| 1.06 | Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. | 1 | cum | - | - |
| 1.07 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. | - | sqm | 1 | - |
| 1.08 | Cement Concrete with graded stone ballast (40 mm size) excluding shutteirng. In ground floor (with N.B. Variety Stone metal) (1:3:6) proporaton | - | cum | 1 | - |
| 1.09 | Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes. River Bazree | 1 | cum | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_2539545.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].