Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹50.7 L
EMD Value
₹50,800
Closing Date
24 Mar 2020, 3:00 pmClosed
Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Renovation of Ponds/ Ooranies in Package No.211 Kalasapakkam Block of Tiruvannamalai District under State Finance Commission Grant for the year 2019-20
2020_RDTN_159202_1
Roc.No.A5/6726/2019 Dt.14.02.2020 211
Open Tender
Civil Works - Water Works
Lump-sum
180 days
Kalasapakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,800
22 Jun 2020
25 Feb 2020
24 Mar 2020
25 Feb 2020
24 Mar 2020
25 Feb 2020
Amount
Part 1 : Renovation of Vellang Kulam at Kilkuppam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Colour Washing with best Distembering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing, preparing the surface and etc.,complete
Provision for Name Board
Part 2 : Renovation of Periya thoppu kulam at Melvilvarayanallu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 3 : Renovation of Peruma Koil Kulam at Pillur
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 4 : Renovation of Amman Koil Kulam at Mattavettu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 5 : Renovation of Periya kulam at Kadalady
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 6 : Renovation of ponnammal kulam at Veeralur
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Dhivya Dharshini Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .