Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC | ₹9.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹10.0 LRejected-AOC | ₹10.0 L | 2 | Rejected-AOC L2 |
| 3 | 3₹10.1 LRejected-AOC | ₹10.1 L | 3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Complete document not found |
| 5 | Rejected-Technical | - | - | Rejected-Technical Complete document not found |
| Sl No | Description | Qty | Unit | Tsering Dorjee L1 | Bapan Mitra L2 | Bishing Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00Renovations works : | ||||||
| 1.01 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.) iii Girth from 900 mm to 1800 mm | 0.01 | Hect | 11.48 ₹11.48 | 11.48 ₹11.48 | 11.48 ₹11.48 |
| 2.01 | Clearing Grass and Removal of Rubbish | 0.01 | Hect | 221.85 ₹221.85 | 221.85 ₹221.85 | 221.85 ₹221.85 |
| 3.01 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m | 40.5 | Cum | 9,744.3 ₹9,744.30 | 9,744.3 ₹9,744.30 | 9,744.3 ₹9,744.30 |
| 4.01 | Providing approved best available local wood (Class B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position | 1,209 | Cum | 6,16,590 ₹6.2 L | 6,16,590 ₹6.2 L | 6,16,590 ₹6.2 L |
| 5.01 | Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including aluminium butt hinges with necessary screws
a) 38 mm thick best available local wood class-B I | 22.77 | Sqm | 91,080 ₹91,080 | 91,080 ₹91,080 | 91,080 ₹91,080 |
| 6.01 | Providing and fixing 20 mm thick wooden planks ceiling (frame work for base to paid separately ) with M.S. screws.
(a) Timber Plank Class – A IV | 77 | Sqm | 91,298.9 ₹91,298.90 | 92,015 ₹92,015 | 1,00,100 ₹1.0 L |
| 7.01 | Providing and fixing plain, square edged wooden beading 38 mm x 12 mm section with screws of approved quality for ceiling
a) Best local approved quality wood. | 188.76 | Mtr | 13,534.09 ₹13,534.09 | 18,876 ₹18,876 | 18,876 ₹18,876 |
| 8.01 | First Class Indian teak wood 25 mm wooden plankings tongued and grooved in flooring including fixing with screw complete | 32 | Sqm | 1,60,000 ₹1.6 L | 1,76,000 ₹1.8 L | 1,76,000 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
15 Sept 2025, 9:00 amClosed
Lt Col Pawan Thapa
Army Camp Tuting
Constr of Staging hut at doni Lupuik
2025_ARMY_728003_1
522/OP SAD/PRI/Doni Lipuik
Open Tender
Construction Works
Constr of Staging Hut at Doni Lipuik
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
5 DOGRA
₹20,000
Tuting
3 Mar 2026
27 Aug 2025
15 Sept 2025
27 Aug 2025
15 Sept 2025
4 Sept 2025
27 Aug 2025 - 28 Aug 2025
27 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid