Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
3 Aug 2026, 5:00 pm
DCF Wildlife Division
Deputy Conservator of Forests, Wild Life Division, Sarahan
Construction of View Point watch tower at Mujlang
2026_FD_139978_1
629/24-07/2026
Open Tender
Civil Works
Item Rate
Sarahan
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
DCF Wildlife Division Sarahan
₹11,000
25 Jul 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
3 Aug 2026
25 Jul 2026
25 Jul 2026 - 3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means
(Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth,1.5 m in width as well as10
sq m on plan) including getting out and disposal of
excavated earth lead upto 50m and lift upto1.5 m,as
directed by Engineer-in-charge. | 9 | Cum | - | - |
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not xceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. | 4.52 | Cum | - | - |
| 3 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. | 0.53 | Cum | - | - |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.01 | 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 1.59 | sqm | - | - |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.01 | 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 2.4 | sqm | - | - |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,266.53 | cum | - | - |
| 7Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. | |||||
| 7.01 | On Steel Work | 86.93 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TenderNotice.pdf
Tender Documents • 0.29 MB
BOQ_207471.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].