| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹65.7 LAccepted-Finance | ₹65.7 L | 1 | Accepted-Finance Accept |
| 2 | 2₹67.0 L+₹1.3 L (2.00%)Rejected-Finance EAGLE CONSTRUCTION | ₹67.0 L+₹1.3 L (2.00%) | 2 | Rejected-Finance Reject |
| 3 | 3₹67.0 L+₹1.3 L (2.00%)Rejected-Finance | ₹67.0 L+₹1.3 L (2.00%) | 3 | Rejected-Finance Reject |
| 4 | Not Admitted-Fee/PreQual/Technical SATARA JILA SATARA 415002 | SATARA | MAHARASHTRA | 415002 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical N A | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹65.7 L
EMD Value
₹65,674
Closing Date
20 Mar 2026, 5:00 pmClosed
Additional Chief Executive Officer Z P Satara
Additional Chief Executive Officer Z P Satara
Improvement to Approch Road to Garlewadi VR 369 Tal-Khatav
2026_SATAR_1285225_3
works/South/L-6/E.T.9/2025-26
Open Tender
Civil Works
Percentage
180 days
Improvement to Approch Road to Garlewadi VR 369 Ta
OPEN
9 documents required · 9 mandatory
₹5,000
₹65,674
7 Sept 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts excetra complete.
Item / Page No : 11 / 296
Additional Specifications : The work shall be carried out as directed by Engineer-In-Charge. | 1 | Cubic Metre | - | - |
| 2 | Removing Non Pressure class 2 and Non Pressure class 3 pipes including stacking at road side as directed by the Engineer in charge. Upto 900 milimetre diameter, excetra complete.
Item / Page No : 30 / 297
Additional Specifications : The work shall be carried out as directed by Engineer-In-Charge. | - | Running Metre | - | - |
| 3 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed, excetra complete. (By Mechanical Means)
Item / Page No : 3 / 84
Specification No : BR.3
Spec. Page No : 102
Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge. | - | Cubic Metre | - | - |
| 4 | Excavation for foundation in hard murum including shoring and strutting as necessary and disposing off excavated stuff as directed, excetra complete.
Item / Page No : 4 / 84
Specification No : BR.3
Spec. Page No : 102
Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge. | - | Cubic Metre | - | - |
| 5 | Excavation for foundation in hard murum and boulders including shoring and strutting as necessary and disposing off excavated stuff as directed, excetra complete. (Lift up to 1.50 metre)
Item / Page No : 6 / 84
Specification No : BR.3
Spec. Page No : 102
Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge. | 1 | Cubic Metre | - | - |
| 6 | Excavation for foundation in soft rock including shoring and strutting as necessary and disposing off excavated stuff as directed, excetra complete. (Lift up to 1.50 metre)
Item / Page No : 8 / 84
Specification No : BR.3
Spec. Page No : 102
Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge. | 1 | Cubic Metre | - | - |
| 7 | Excavation for foundation in hard rock by controlled blasting including shoring and strutting as necessary and disposing off excavated stuff as directed, excetra complete. (Lift up to 1.50 metre)
Item / Page No : 10 / 85
Specification No : BR.3
Spec. Page No : 102-103
Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge. | - | Cubic Metre | 1 | - |
| 8 | Excavation for foundation in hard rock by chiselling and wedging or line drilling including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed, excetra complete. (Lift up to 1.50 metre)
Item / Page No : 11 / 85
Specification No : BR.3
Spec. Page No : 102-103
Additional Specifications : The useful excavated material shall be utilised as directed by the Engineer in-charge. | - | Cubic Metre | 1 | - |
| 9 | Dewatering on brake horse power basis by using water pump including diversion of stream, providing coffer dams, earthen bunds, excetra as may be necessary for foundation and other parts of the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump, excetra complete.(prior approval of Superintending Engineer will be necessary)
Item / Page No : 22 / 85
Specification No : BR.4
Spec. Page No : 104-105 | - | Hour | - | - |
| 10 | Providing and laying in situ / ready mix M-25 plain cement concrete of trap / granite / quartzite / gneiss metal for cast in citu piers, abutment, returns, wings, excetra including provision of "V" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood / steel form work, centering (excluding dewatering by means of pump) and including bailling out water and curing finishing in cement mortar 1:3 excetra complete, as directed by engineer in charge. (With Concrete Mixer) With fine agreegates of required specifications (Natural sand / VSI sand finely washed excetra) (using ARTIFICIAL SAND). (Height up to 5 metre)
Item / Page No : 40 / 133
Additional Specifications : 1. The appropriate mix design shall be got done well in advance from the approved government laboratory and the same shall also be got approved from Engineer in-charge, before starting the work. 2. Cement from the same stock sent for mix design shall be used for concreting work. 3. The minimum cement for reinforced cement concrete / plain concrete to ensure durability / strength shall be as per IS 456-2000 with latest ammendment. If actual cement required / consumed is more than the provision in the IS code / approved mix design, no claim for that shall be entertained and cost for that shall be bourned by the contractor. 4. Before concreting work, cement from each consignment shall be got tested and if the strength of cement varies considerably from the approved mix design, the mix design should be got modified according to strength of fresh cement available in stock and concreting work should be done according to modified mix design. 5. For every consignment of cement, a sample shall be got tested as per norms and frequency of Vigilance and Quality Control Circle, Pune. As regards testing of cement it will be entire responsibility of the contractor. 6. If artificial / VSI crushed sand is used instead of natural sand; terms, conditions and specifications mentioned in Circular by Chief Engineer, Public Works Region, Pune bearing No CEP/D-2/Buildings-2/5940/2017 dated 17/10/2017 and Annexure-I attached to it and also Circular by Chief Engineer, Public Works Region, Nagpur bearing No 36 dated 15/01/2019 and Annexure-I attached to it will be appicable. | 1 | Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
B1.pdf
Tender Documents • 5.48 MB
BOQ_2210322.xls
BOQ • 0.30 MB
corrikhatav.pdf
PDF • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .