| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC as per approved TCR | |
| 2 | Rejected-Technical | - | Rejected-Technical As per NIT | |
| 3 | Rejected-Technical | - | Rejected-Technical As per NIT |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 |
|---|---|---|---|---|
| 1.00Item description | ||||
| 1.01 | Cost of primary wire (bare conductor) new strip to be required | 226 | KG | 876 ₹1,97,976 Lowest |
| 1.02 | cost of secondary wire (bare conductor) | 146 | KG | 876 ₹1,27,896 Lowest |
| 1.03 | Less scrap value of old conductor | 364 | KG | 510 ₹-1,85,640 Lowest |
| 1.04 | Cost of reinsualtion of new conductor TPC | 372 | KG | 65 ₹24,180 Lowest |
| 1.05 | Dismantling the coil from core for weighment | 1 | LS | 3,500 ₹3,500 Lowest |
| 1.06 | Charges for detanking and assembling of transformer | 1 | LS | 3,200 ₹3,200 Lowest |
| 1.07 | Lamination the core with proper materials | 1 | LS | 8,000 ₹8,000 Lowest |
| 1.08 | Cleaning of cooling tubes and tanks | 1 | LS | 3,500 ₹3,500 Lowest |
| 1.09 | Cooling pipe welding according requirement with selfos rod | 1 | LS | 7,000 ₹7,000 Lowest |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
22 Jul 2025, 10:00 amClosed
General Manager,SSA
Office of the General Manager,SSA
Complete repairing/rewinding of 400KVA,11KV/440V transformer installed at near Nimcha weighbridge of Nimcha (R) Colliery under Satgram-Sripur Area.
2025_ECL_339184_1
ECL/SSA/GM/E M/E-NIT/2025-26/23 Date 08.07.2025
Open Tender
Electrical and Maintenance Works
Fixed-rate
30 days
Nimcha Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,900
12 Dec 2025
12 Jul 2025
23 Jul 2025
12 Jul 2025
22 Jul 2025
12 Jul 2025
12 Jul 2025 - 16 Jul 2025
Amount
Item description
Cost of primary wire (bare conductor) new strip to be required
cost of secondary wire (bare conductor)
Less scrap value of old conductor
Cost of reinsualtion of new conductor TPC
Dismantling the coil from core for weighment
Charges for detanking and assembling of transformer
Lamination the core with proper materials
Cleaning of cooling tubes and tanks
Cooling pipe welding according requirement with selfos rod
MS channel fitted at tank both side as per requirement
Fitting of reformed coils in the limbs with required insualtion
Gasket, nut bolts and other hardware items
Repairing of complete set tap changer
Studs with insualtor changing
Supply of insualtion like varnish etc.
Retanking the coil in tank
Assembling of coil
Heating and testing of coil
Labour charges
Oil filtration
Transportation charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .