Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 2 10 SIVAGANGAI MAIN ROAD VARICHIYUR POST MADURAI 20 | MADURAI | TAMIL NADU | 625001 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
10 Mar 2026, 3:00 pmClosed
Project Director
DRDA,Sivagangai
1.Madurai Nedungulam Road to Karisalkulam Road
2026_RDTN_670247_1
MGSMT_Add_TPM_Pack_5
Open Tender
Civil Works
Item Wise
180 days
Sivagangai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.4 L
10 Mar 2026
4 Mar 2026
10 Mar 2026
4 Mar 2026
10 Mar 2026
4 Mar 2026
Clearing the scrub Jungle with out uprooting including all labour charges
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction
Picking the existing worn out B.T Surface including all charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying tack coat over WMM unprimed surface using 2.50kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc.,
Providing and applying Prime Coat with bitumen emulsion (SS1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502
BITUMINOUS MACADAM 50 MM THICK: Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of 1.5 m RCC Slab Culvert @ ch 7 m
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items Slab Centring
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision for Kilo Metre Stone
Provision for Hecta Metre Stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
5_Tpm_TenderDoc.pdf
Tender Documents • 0.67 MB
BOQ_805472.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .