Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical BELAVATIKAR TOLA RARO P S DANDAI GARHWA | Accepted-Technical Accept |
| 2 | Accepted-Technical AT KAUSHALYA SADAN CIRCULAR ROAD BARMASIYA DISTRICT DEOGHAR | Accepted-Technical Accept |
| 3 | Rejected-Technical SINGH NAGAR KATRAS MORE JHARIA DHANBAD | Rejected-Technical Reject |
| 4 | Rejected-Technical | Rejected-Technical Reject |
| 5 | Rejected-Technical BHUMSA TOLI CHUTIA RANCHI | RANCHI | RANCHI | JHARKHAND | 834001 | Rejected-Technical Reject |
Tender Value
₹59.1 L
EMD Value
₹1.2 L
Closing Date
4 May 2026, 2:00 pmClosed
Executive Engineer N.R.E.P-1,Ranchi
Executive Engineer N.R.E.P-1,Ranchi Vikash Bhawan Ranchi
CONSTRUCTION OF PCC ROAD INCLUDING A CULVERT FROM ROHINI COLONY ROAD NO 9 TO THE TEMPLE IN TUMANG PANCHAYAT KHALARI BLOCK
2026_NREPR_113361_1
NREP1/08/2026-27 DMFT
Open Tender
Civil Works
Item Rate
270 days
Khelari
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.2 L
23 Jun 2026
27 Apr 2026
5 May 2026
27 Apr 2026
4 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 1,631.27 | cum | - | - |
| 2 | By Mix in Plant Method
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (grading-Iv material) | 543.76 | M3 | - | - |
| 3 | Providing and laying in position cement concret of specified grade excluding the cost of centring and shuttering -All work upto plinth level:-(1:1.5:3(1cement :1.5coarse sand (zone-III):3 graded stone aggregate 20mm nominal size) | 453.13 | M3 | - | - |
| 4 | Centring and shuttering including strutting ,proping etc and removal of form for foundation ,footing ,bases of columns ,etc for mass concrete | 396.38 | M2 | - | - |
| 5 | Separation Membrane of impermeable plastic sheeting 125 micron thick | 3,271.38 | SQM | - | - |
| 6 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 112.83 | M3 | - | - |
| 7 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 62.46 | m3 | - | - |
| 8 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume) | 10.4 | m3 | - | - |
| 9 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 9.29 | m3 | - | - |
| 10 | Providing and laying cement concrete in tetaining walls, return walls, walls (any thickness) including attached pilasters, columna, piers, abutments, pillars, posts, struts, buttresses, string of lacing courses, parapates, coping, bed blocks, anchor blocks, plain window sills, fillets sunken floor etc. up to floor fice level excluding the cost of centering shuttering and finishing | 11.16 | m3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_153097.xls
BOQ • 0.99 MB
F2_Rohaniyatand.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .